CI-v4 EAp2:Minimum energy performanceposted by Dave Hubka on
kinda embarrassed to ask this one, but here goes...
Furniture
NC-v4 MRc5:Construction and demolition waste managementposted by Alexandra Kravel on
We are working on a partial renovation for a college building.
Furniture
NC-v4 MRp2:Construction and demolition waste management planningposted by Alexandra Kravel on
We are working on a partial renovation for a college building.
Passive Survivability and Back-up Power During Disruptions
NC-v4 INc1:Innovationposted by Ridhwan Omar on
Hello LEEDUsers!
We have a resort hotel project in one of the islands in Micronesia.
CO Sensors for every Residential Unit as per Minimum IAQ Performance
NC-v4 EQp1:Minimum indoor air quality performanceposted by Alokmay Behera on
In one of our Projects with residential spaces, we are required to provided CO sensors for every residential unit. This is a mandatory requirement under the pre-requisite.
OPR & BOD & Design Document review
NC-v4 EAp1:Fundamental commissioning and verificationposted by Dave Hubka on
Fundamental Commissioning requires the CxA to review the OPR and BOD and design documents.
Renewable Energy Production
NC-v4 EAp2:Minimum energy performanceposted by Piotr Adamczyk on
Dear All,
Baseline Model for Data center Economizer
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi,
All Gender Restrooms - Extent of Hygiene Product Distribution
NC-v4 INc1:Innovationposted by Summer Minchew on
The All Gender Restrooms Pilot general requirements state: "Facilities should provide means for the distribution of menstruation hygiene products." This is a little vauge, does this mean every all
Schedule for Data Center Load
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi I am modeling a Data Center what schedule should I use for IT loads, should I run it for 100% all the time?