Forum quick links
Indoor Water Use Reduction calculator - Gender Ratio
NC-v4 WEp2:Indoor water use reductionposted by Caterina Panteghini on
Hi,
did anybody flag "Non default gender mix" in the calculator?
CO2 monitoring for exhaust fan system?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dang Thi on
Our project are factory, the ventilation system use exhaust fans combined with louvre / open door to tranfer outside air direct from outside.
Recycle content for Ready Mix concrete
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Osman Faroq on
Dear LEED users. Hope you are all dowing well.
Band for UMLHs for vault spaces in a Data Center
NC-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
Hi , I am modeling a LEED model for data center, now for vault spaces I am assuming a setpoint of 99 F for cooling and 20 F for heating, what should be band to consider a vault space UMLH?
Option 2, A
NC-v4 EQc6:Interior lightingposted by Simon Lai on
In the open office, I'm providing direct/indirect fluorescent up-light, does it meet the exception of the Option 2A?
Shower column kit with 3 different features and water consumptions.
NC-v4 WEp2:Indoor water use reductionposted by Olga Yuil on
For showers in a new Project a shower column kit will be installed and it includes: a showerhead, a hose and a faucet.
(Example: Kohler Singulier K-72672T-C4-CP)
Reclaimed water irrigation service metering - can this effectively fulfill quota of (2) minimum water subsystems?
NC-v4 WEc4:Water meteringposted by Joanna Switzer on
Step 2 of the Step-by-Step BD+C Reference guidance notes...."if the team is using reclaimed water for irrigation, 100% of this water must be submetered.
LEED v4 Waste Monitoring unit of measurement in Truck Load
CS-v4 MRc5:Construction and demolition waste managementposted by Ronnel Flores on
Our project's waste quantity was recorded in truck load not in kilograms. This counts as volume?
Changing structural systems between the baseline and proposed design
NC-v4 MRc1:Building life-cycle impact reductionposted by Ahmed Abd El Fattah on
Hello
Is changing from concrete structure to steel structure accepted in LCA?
Ventilation in corridors
NC-v4 EQp1:Minimum indoor air quality performanceposted by Luana Jerez on
We are working on an office building 17 meters wide, on one floor, the layout is a 3.5-meter distribution corridor, serving as a division between two rows of offices.