Open-Grid Pavement 50% Unbound? How to Calculate?
CS-v4 SSc5:Heat island reductionposted by Marine Petrosyan on
Hi, Team!
Can you please help me understand, how the 50% unbound is calculated for the open-grid pavement?
Lighting Zone determination for an industrial project
NC-v4 SSc6:Light pollution reductionposted by Lenka Matějíčková on
Hi,
Case 2. Systems unable to meet required outdoor airflow rates
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
I don't understand Case 2.
Minimum Energy Performance
CI-v4 EAp2:Minimum energy performanceposted by Nagaraj Sankar on
As we have a VRF system for fresh air, we design a seperate proposed case system module for the fresh air system.
Testing Equipment for Option 2
NC-v4 EQc4:Indoor air quality assessmentposted by Gregory Patton on
Does anyone have a rec for simple testing equipment to meet Option 2?
Thanks!
How many tests per square foot?
NC-v4 EQc4:Indoor air quality assessmentposted by Samantha Lee on
Hi all!
Interior element reuse in different project
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Nadia Azzam on
Our project is demolishing a wall partition which is going to be reused on a different project (not the one applying for LEED).
Water Calcultion for Commerical ID+C project
CI-v4 WEc1:Indoor water use reductionposted by Amgad Khattab on
We have a project with the following :
- Tenet space has not any WC [Toilets] in the tenet space. but they are using the WC in the core area.
Hint:
Lighting Control - Recording Studio
CI-v4 EQc6:Interior lightingposted by Edgar Arevalo on
I have a library project that has a recording studio in the basement. After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor. After