NC-v4 SSc4:Rainwater managementposted by Adam Stoker on
The reference guide and the Rainfall Events Calculator provided by the USGBC alternatingly use the terms 'rainfall' and 'precipitation; while this is fine for temperate climates, it leaves us north
Entering nonregularily occupied spaces in IEQp1 spread sheet cal
NC-v4 EQp1:Minimum indoor air quality performanceposted by Vassil Vassilev on
Greetings, In the IEQp1 calculation form, provided by USGBC for using in LEED v4, in the Occupancy Category pull-down menu, there is nothing related to equipment rooms, non-occupied stores and sim
62MZ calculator in version 4 LEED
NC-v4 EQp1:Minimum indoor air quality performanceposted by BEE Incorporations on
There is no 62MZ calculator in version 4 LEED here: http://cn.usgbc.org/resources/minimum-indoor-air-quality-performance-calculator Is there a new 62MZ calculator in version 4 LEED?
Separate MEP CxA and BECxA
NC-v4 EAc1:Enhanced commissioningposted by Annalise Reichert on
I am working on a project that is pursuing both Monitoring-based Commissioning and Building Envelope Commissioning.
District cooling system with different construction planning
NC-v4 EAp2:Minimum energy performanceposted by Jeroen Sap on
I have a project at hand with a high LEED ambition. They have the opportunity to connect to a future district cooling system (high efficiency).
Calculating Materials vs. Construction vs. Project costs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jessica McNaughton on
The default materials calculation is 45% of construction costs (Div 3-10 primarily). Is there a generally accepted percentage of project costs that is considered to be construction costs?
FSC Language in LEED V4
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Dori Hauser on
The alternative documentation process for FSC as described in V4 on page 534 is confusing: The issues in particular are: - The woodworker must install the product.
Data Center Baseline systems
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings everybody I'm modeling a datacenter and there are few issues about which I'm wondering how to proceed. The project consists of two building adhered to each other.
Auditorium seating
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Dear all, Does auditorium seating fall under furniture category ? If yes, had we include it for calculation or it is optional ?
Envelope Commissioning for a Major Renovation
NC-v4 EAc1:Enhanced commissioningposted by Eleni Tsivitzi on
Does anyone have experience doing envelope commissioning for an existing building? The project will be a Major Renovation with fairly extensive HVAC upgrades.