NC-v4 MPR3:Must comply with project size requirements
posted by  Claire DeCamp  on 

We've got a building with no FTE - it houses mostly lab equipment that is managed by a researcher and then left alone. There are no restrooms, offices, etc.

5
Default Avatar
LEED AP BD+C
MZ and Partners
LEEDuser Basic Member
0 thumbs up
Thu Feb 16, 2017, 11:38 pm

Emission tests for 2-component epoxy flooring systems

NC-v4 EQc2:Low emitting materials
posted by  Björn Schön  on 

According to the LEED v.4 credits, it is possible to use different emission tests outside the US to comply with the requirements. AgBB and DiBt testing method (2010) are mentioned there. But accor

3
Independent consultant on VOC issues
formerly with Eurofins Product Testing A/S
LEEDuser Basic Member
246 thumbs up
Fri Feb 17, 2017, 6:40 am

Definition of "Sourced"?

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Douglas Flandro  on 

The credit language says,"For credit achievement calculation, products sourced (extracted, manufactured, purchased) within 100 miles (160 km) of the project site are valued at 200% of their base co

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Thu Feb 16, 2017, 7:30 pm

Single certificate or multiple certificates?

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Ricardo Sá  on 

I am currently involved in the rehabilitation project of a set of school buildings located on the same grounds.

6
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Wed Feb 15, 2017, 2:18 pm

CAV and BAS monitor

CS-v4 EQp1:Minimum indoor air quality performance
posted by  Takayuki Hirota  on 

For CAV, a current transducer on the supply fan, an airflow switch, or similar monitoring device must be installed. If a BAS can monitor airflow fan modes (strong/weak etc.), is that sufficient to

2
Sustainability Account Manager
Stok
LEEDuser Expert
177 thumbs up
Mon Feb 13, 2017, 3:51 pm

HUD DDA Designation

NC-v4 LTc3:High priority site
posted by  Nathan Gauthier  on 

Can any project get this credit if they're in a DDA area? It seems like the DDA only exists to identify areas where additional subsidy is needed for low-income housing.

2
Sustainable Practice Leader
Tsoi/Kobus & Associates
LEEDuser Basic Member
12 thumbs up
Wed Feb 8, 2017, 2:49 pm

"Box" within an exisiting Warehouse

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Gina Dederer  on 

Our particular project consists of a 400sqm 1 floor "Box" (walls and roof) to be built in its entirety inside a much larger existing warehouse, which itself is part of a large industrial complex (b

3
Default Avatar
URS Deutschland GmbH
LEEDuser Basic Member
3 thumbs up
Tue Feb 7, 2017, 5:22 pm

carpet

EBOM-v4 MRc3:Purchasing - facility maintenance and renovation
posted by  Pablo Fortunato Suarez  on 

This is related to the previous query. I see no reference to certification from the Carpet and Rug Institute which was present in v3.

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Feb 6, 2017, 5:30 am

Confusion over adjacency and shared systems

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  GBD Architects  on 

Hi all, We are looking to certify a new childcare building on a higher-ed campus that will be sharing HVAC systems with an existing childcare building.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat Feb 4, 2017, 4:07 am

FloorScore credit on wall applications

NC-v4 EQc2:Low emitting materials
posted by  Rick Farrell  on 

If a FloorScore certified product, specifically a pre-finished engineered wood floor, is applied to a wall or ceiling application does the product contribute to the EQc2 credit in LEED v.4?

4
Independent consultant on VOC issues
formerly with Eurofins Product Testing A/S
LEEDuser Basic Member
246 thumbs up
Wed Feb 1, 2017, 6:41 pm