NC-v4 LTc1:LEED for Neighborhood Development locationposted by Bazeeth Ahamed K M on
The points table can be based on rating system like NC, CS, School etc instead of BD&C
Green e energy equivalency EKOenergy
CI-v4 EAc6:Green power and carbon offsetsposted by Valentin Grimaud on
Good afternoon, I'm working for a design building company in France. We aim the LEED certification for a shop project. We try do get 2 points for the Green Power and carbon offset credit.
Building Entrances
NC-v4 EQp2:Environmental tobacco smoke controlposted by Johanna Scogin on
We have some overhead rolling doors (for trucks to enter the garage portion of the commercial building) along with some man doors.
DES systems
CS-v4 EAc2:Optimize energy performanceposted by Mike D on
If the building is connected to a DES system, do both the DES system as well as the building itself need to be modelled?
Number of cycles
EBOM-v4 WEc3:Cooling tower water useposted by Jonathan Miller on
What is the number of cycles necessary to achieve 1 point? 10?
PV - how is it accounted for?
Mid-Rise-v4 EAp1:Minimum energy performanceposted by sue bryant on
I would like to confirm that PV is accounted for solely in the energy model for V4 Midrise projects. Unlike Homes, there are no credits targeting PV. Also, I see no Innovation credits.
Resuspension of particles from flooring?
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Roger Lewis on
Is there any LEED criteria for type of flooring that is necessary to prevent resuspension of particles from flooring into the indoor atmosphere?
Soil Restauration in vegetated roof
NC-v4 SSc2:Site development - protect or restore habitatposted by Ana García on
Dear All, We are working in a project, in which the whole site was previously developed and paved. All new green areas will be vegetated roofs (project achieves a density of 1.5 floor-area ratio).
Steel Studs vs. Track
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Johanna Scogin on
Does the steel stud count as different material than the track?
Elevated Airtrain station
NC-v4 MPR1:Must be in a permanent location on existing landposted by Judhajit Chakraborty on
How does this MPR impact elevated station projects?