DES Option 1 - Baseline System
NC-v4 EAp2:Minimum energy performanceposted by Jay patel on
I am modeling a new building(Laboratory/office) on a university campus following LEED v4 Option 1, Whole Building Energy Simulation. New Building is 3 story and 69,500 sq.ft .
Fundamental Refrigerant Management: Leed v4- Campus Credit
EBOM-v4 EAp4:Fundamental refrigerant managementposted by Patricia Andrasik on
We are attempting to get the Fundamental Refrigerant Management credit as a campus credit. We are going to peruse the economic feasibility option with leakage tracking.
Measuring through connection interval distance
ND-Plan-v4 NPDc6:Connected circulation networkposted by Ian Scott on
Where the project boundary is located on the project side of adjacent ROW is through connection distance measured between ROW centrelines at the project boundary or at the adjacent ROW centreline.
"Preserve from development activity 40% of the greenfield area"
NC-v4 SSc2:Site development - protect or restore habitatposted by Natalie Otoole on
Our 5 acre site has no greenfield area- we are demolishing the entire site and will restore with some green space/vegetation after construction.
Off-site charging station
NC-v4 LTc8:Green vehiclesposted by Kristina Pobre on
My client is developing a big parcel of land. We are applying certification for only a small part of it (about 2%). The LEED-project has its own parking and a % of it is for green vehicles.
Surrounding Density - Previously Developed Site
NC-v4 LTc4:Surrounding density and diverse usesposted by Dana Waters on
In the Required Documentation section of the Reference Guide, it states that a project must provide a "description of the previous development on the site." How does USGBC define the "site" in thi
Translucent Glazing Film
NC-v4 EQc2:Low emitting materialsposted by Eric White on
Our project is using a translucent film on several demountable glass office partitions to provide screening and privacy.
Overhangs and light transmittance vrs daylighting
CI-v4 EAp2:Minimum energy performanceposted by Gustav Alfaro on
Hi everyone, This office tenant space is located in a building with large overhangs and the visible transmittance through the windows is poor, we ran daylight simulations and it seems that the lig
Option 1: Limited Turf Area
EBOM-v4 SSc5:Site managementposted by Stephanie Donovan on
Hello - the site I'm looking at already has under 25% turf area. In fact it has no turf, only vegetation.
LEED v4 CI , E&A :AEDG 50% requirements
CI-v4 EAc2:Optimize energy performanceposted by Vinay Shekar on
The tenant space that we are looking to certify for LEED v4 CI is part of an existing building .