Solar PV Array Ownership
NC-v4 EAc5:Renewable energy productionposted by Gray Bender on
Hello, I have a question about the ownership of a solar PV array, and how that effects this and any other credit.
List of meters
NC-v4 EAc3:Advanced energy meteringposted by Vasileios Kalfountzos on
Hello all, our project is a Data Center that every single part of it will be metered. Each rack will have two meters while also every electrical panel will have each own meter.
EAcp66 Community Contaminant Prevention- Airborne Releases
NC-v4 INc1:Innovationposted by Helene Lefkowitz on
Our project team found the Community Contaminant Prevention- Airborne Releases to be a great pilot credit to continue working toward a more pure indoor air quality.
Energy Modeling Requirements
Retail-CI-v4 EAp2:Minimum energy performanceposted by Jeff Halliwell on
On LEED V4, ID+C Commercial Interiors:Retail, is there an option to use the California Title 24 as the calculation method or do you have to use ASHRAE 2010?
Building with no FTE
NC-v4 LTc6:Bicycle facilitiesposted by Nathan Gauthier on
Has anybody proposed eliminating showers and / or long-term bike storage in a building with no FTE? We're renovating a small wood-frame classroom building with 8 classrooms.
Secure Long-Term Storage - "Within" 100'-0" Feet
CI-v4 LTc4:Bicycle facilitiesposted by Kristina Bach on
Our project is looking at providing an enclosed long-term bicycle storage area which is only accessible by key-card to FTE's who have signed the bicycle access agreement.
ASHRAE 90.1-2010 VRF Requirements
NC-v4 EAp2:Minimum energy performanceposted by Rudolph Carneiro on
Does anyone know wether or not evaporator input power should be included in the efficiency calculation of a VRF system?
Recommended values for Met and CLO and size of zones
NC-v4 EQc5:Thermal comfortposted by Sandra Holmström on
Hi! Is there any recommended value för Met and CLO that you must use when you perform your calculation of PMV/PPD etc? Is there any recommended size of the zones that require thermal comfort Cont
Only 200 yards to a bike network seems harsh!
CI-v4 LTc4:Bicycle facilitiesposted by Susan Di Giulio on
We have a LEED-CS v2009 project in the heart of downtown LA: 2 blocks from a major Metro train hub, 4 blocks from one complete street with protected bike lanes and 3 blocks from another.
Maximum Number of Cycles
NC-v4 WEc3:Cooling tower water useposted by Apoorv Goyal on
Hi, based on a water test report, if the number of cycles already exceed 10, does that mean that both points are achievable?