Forum quick links
MRpc102-Legal Wood
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Kristopher Croghan on
So in doing some research, are the following certifications acceptable for the legal wood pilot credit?
Number of Bus Routes Required
NC-v4 LTc5:Access to quality transitposted by Carolyn Risley on
To confirm, is it possible to achieve LTc5 with just one bus route so long as the minimum number of weekday/weekend trips are satisfied?
Option 3: Determining HC and NOx emissions
EBOM-v4 SSc5:Site managementposted by Michelle Raigosa on
Although an Equipment Emissions Reduction Calculator is provided, how do we address maintenance vehicles used on site?
Qualifications for ID+C rating system
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Mercedes Ferreira on
Does the project building need to be a rented space in order for it to fall under the ID+C rating system?
Multiple indentical RTUs combined with plenum ducts
NC-v4 EQp1:Minimum indoor air quality performanceposted by Chanyang Shin on
Multiple identical RTUs combined with plenum ducts serve a whole building. How can I prepare 62.1 MZcal? Can I add up cfm of all RTUs and assume it like one system using one sheet?
energy used on-site vs sold energy
NC-v4 EAc5:Renewable energy productionposted by LEEDme Lorenzi on
I’m reading the new version of the reference guide and I have some doubts concerning this credit. As example, within the LEED boundary electricity is produced by pv panels.
Alley
ND-Plan-v4 NPDp1:Walkable streetsposted by Martine Desbois on
Is there a definition for what constitute an alley? I cannot find one in the Reference Guide. Thank you
Space control requirement sales area
CI-v4 EAp2:Minimum energy performanceposted by Gabriela Crespo on
There is a mandatory requirement to instal a space control that will have at least one control step (between 30 and 70%) for each space.
Project size extended in the middle of construction
NC-v4 MPR3:Must comply with project size requirementsposted by wachira sosaeng on
My project registered for LEED 2009, mixed use building with 2 towers on the same podium.
SCS not yet approved?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Erin Holdenried on
SCS certified EPDs are not yet approved?