Forum quick links
REC Types
NC-v4 EAc7:Green power and carbon offsetsposted by Martin Christensen on
Hi, I understand that the RECs need to be Green-e certified but their are different types of recs in MA where my building is located.
Site vegetated when project started; however it was previously developed
NC-v4 LTc2:Sensitive land protectionposted by Helen Kessler on
Our v4 project is on a site that previously had a housing development. This development was removed some time ago and the land now has grass and trees. We would like to say it was previ
HAVC zoning and controls
CI-v4 EAc2:Optimize energy performanceposted by Amy L on
For controls in perimeter offices or perimeter nondensely occupied specialty use spaces, it says ‘a separate thermal control for each space paired with an occupant-sensing or CO2-sensing device
Reclaimed land from sea
NC-v4 MPR1:Must be in a permanent location on existing landposted by Bazeeth Ahamed K M on
"All LEED projects must be constructed and operated on a permanent location on existing land" So reclaimed land from sea(artificial island) would not be eligible for LEED V 4 as they are not existi
Strategy to fulfill the pilot credit Quality views in non regularly occupied spaces
NC-v4 EQc8:Quality viewsposted by Angela Atehortua on
In a Project that we are advising that consists of an Innovation building for a University, we are aiming to achieve this pilot loan by implementing two main strategies, the first is that all space
Exceptions for museums?
NC-v4 EAp2:Minimum energy performanceposted by Michelle Smith on
We have a 8,335 sq. ft. historic building which is being renovated to accommodate several small natural history collections which require specific humidity and temperature set points.
waste materials such as fly ash -coal and sugar cane based - to replace cement .
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Ajaye Jogoo on
We shall appreciate if you could provide us with leed assessment on the above .
We use an emulsifier tested as PH7 to replace a carbon burn out using fossil fuel .
Regional Prioroty credit RPc1
NC-v4 RPc1:Regional priorityposted by Randall Beatty on
What is available under EAc1 for a regional priority credit for Fort Huachuca, Arizona?