Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Option 2 - Carbon dioxide monitoring

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Marina Curto  on 

We are working on a New Construction - Warehouse project that has two separate spaces (offices + warehouses). There are no densely occupied spaces with the expected occupancy considered.

4
www.afogreenbuild.com
Green Building Consultant
LEEDuser Premium Member
249 thumbs up
Sun Jul 21, 2024, 5:29 am

Office kitchen to be considered as regularly occupied space for Daylight Analysis

NC-v4 EQc7:Daylight
posted by  Rajat Kumar  on 

We are working on a project involving an office building with a kitchen with a total area of 50 square meters. We don

0

Baseline System 7 VAV - high Vot due to low Evz

CS-v4 EAc2:Optimize energy performance
posted by  Lenka Matějíčková  on 

Hi All, 

I would like to consult the derivation of the System Outdoor Air Intake (Vot) for baseline system 7 VAV under ASHRAE 90.1 - 2010.

2
Thu Jul 18, 2024, 1:05 pm

Regarding no refrigerant option

NC-v4 EAc6:Enhanced refrigerant management
posted by  Nagaraj Sankar  on 
The project having spaces without cooling systems.In this case can we purchase no refrigerant option to achieve this credit. Anyone please insists to move ahead on this scenario. Thanks in advance
3
Thu Jul 18, 2024, 1:29 am

Hard-lid ceiling with access panel

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by     on 

For interior cross-contamination prevention - Has anyone successfully submitted a project with an access panel in a hard lid ceiling?

0
8
Tue Jul 16, 2024, 1:56 am

How to model process chilled water load?

NC-v4 EAp2:Minimum energy performance
posted by  Eric Dixon  on 

My proposed design for lab utilizes a heat recovery chiller connected to geo-exchange. There is a 40 ton process chilled water load on the heat recovery chiller.

1
Thu Jul 18, 2024, 1:46 pm
3
Default Avatar
Energy Consultant - LEED AP BD+C
ECOPENTA
LEEDuser Basic Member
3 thumbs up
Mon Jul 15, 2024, 7:11 pm

Maximum Distance from Parking to Site

NC-v4 LTc7:Reduced parking footprint
posted by  Laraib Raza  on 

Hello All LEED Users,My question is what is the maximum distance allowed from the building(site) to parking? If the Parking is located outside of the site boundary?

0

Lighting Boundary Modification - Light Trespass: Option 1. BUG Rating Method Only?

NC-v4 SSc6:Light pollution reduction
posted by  Lenka Matějíčková  on 

The LEED manual states that, under certain conditions, the lighting boundary can be modified (e.g.when the property line is adjacent to a public street, alley, or transit corridor, the lighting bou

5
Thu Jul 11, 2024, 1:15 am