Forum quick links
Scope of credit
CS-v4 EQc3:Construction indoor air quality management planposted by ilse angel on
During construction there is an stage when the contractor is building the slabs and columns of the levels above the ground floor.
mixed trees and shrubs in water budget tool
CS-v4 WEc1:Outdoor water use reductionposted by Sareet Benayahu on
hi all,
Energy Modelling - Baseline water-cooled chiller's COP, adjusted to local outdoor conditions in lieu of AHRI conditions?
CI-v4 EAc2:Optimize energy performanceposted by Andrew Xiao Junzhao on
Dear LEED APs,
I have a LEED CI v4 project in Taipei, Taiwan, which require whole building energy modelling. Couple of questions I hope to seek clarity:
Reuse furniture cost
CI-v4 MRc2:Interiors life-cycle impact reductionposted by pradeep kumar on
We are doing the project in which our client reusing the furniture from their existing office to the new office. Furniture comprises of wooden tables, chairs etc.
Watersense products
NC-v4 WEp2:Indoor water use reductionposted by Reshadee Weerasooriya on
When a project outside US cannot find equivalent listed, is it enough just to meet the specified 20% reduction requirements?
Steam to Hot Water Heat Exchanger Metering
NC-v4 WEp3:Building-level water meteringposted by Greg DiDomenico on
Hello all,
PROJECTS WITHOUT AVAILABLE RECYCLING INFRASTRUCTURE
NC-v4 MRp1:Storage and collection of recyclablesposted by Giuseppina Amorusi on
Hallo
I have a project in a site where there are no available recycling infrastructure.
Reference pressure in Europe 3 bar
NC-v4 WEp2:Indoor water use reductionposted by Ricardo Sá on
Hi,
Strategies E- Casework?
NC-v4 EQc6:Interior lightingposted by LUCY WILLIAMS on
Do you have to consider the color/ light reflectance value of the built-in casework within the occupied spaces, under strategy e? Casework is not technically a wall surface nor is it a work s