Forum quick links
Infill Development points available for Previously Developed properties?
Homes-v4 LTc2:Site selectionposted by Edward Gulick on
The LEEDv4 for Homes Reference Guide is not explicit on whether a previously developed property is eligible for the Infill Development points. On the one hand, the suggested maximum point tot
Post-industrial and pre-consumer
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Kavita Karmarkar on
Hi all,
Calculating Conditioned Area
NC-v4 EAp2:Minimum energy performanceposted by Keith Wallace on
Given a building with all conditioned spaces, what is recommended or required to determine the conditioned area square footage? Do you take measurements from the exterior face of the exterior
non-attainment area for PM2.5
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
In Europe which parameters shall be considered to establish whether the site is non-attainment area for PM2.5?
ID+C CI v4 - Innovation: Purchasing - lamps
EBOM-v4 MRc2:Purchasing - lampsposted by Anna McGee on
Hello - We're looking into the Innovation credit for low/no mercury lamps for our CI renovation. The innovation credit has the below notice:
Construction Waste Recycling Plant distance from Site
CI-v4 MRc6:Construction and demolition waste managementposted by Ana Mendoza on
Hello
We are currently working in a location where there aren't any gypsum recycling plant within a 200 mi radius. We have been looking
Design-Build CxA
CI-v4 EAc1:Enhanced commissioningposted by Mark Kohles on
In USGBC's "Who can be a Cxa" document (https://www.usgbc.org/resources/who-can-be-cxa), an independent company, not a member
What is the best value about two different interpretations of a cold room system for LEED points.
CS-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Josée Lupien on
Hello,
We have an issue about how to perform an EPD project for a client.
Our client would like an EPD for their Insulated Metal Panels used for cold room system.
Submeter 2 water subsystems but only one system in the building
CS-v4 WEc4:Water meteringposted by Kristina Pobre on
The credit requires to submeter at least 2 of the following subsystems: irrigation, indoor plumbing fixtures and fittings, domestic hot water, boiler, reclaimed water, and other process water.