Pilot Credit 82: Local Food Production as Innovation Credit
EBOM-v4 INc1:Innovationposted by Nicole Isk on
We're trying to achieve an Innovation credit for our EBOM Project and considering submitting a Pilot credit 82:Local Food Production/WELL Crédit 51 Food Production as Innovation credit as there's a
Cooling tower counted in WEp2?
NC-v4 WEp2:Indoor water use reductionposted by Hieu Huynh on
Hi LEED experts, my factory has a cooling tower but it's for manufacture process, not for the HVAC system. Will this type of Cooling tower be taken into account for this Prerequisite?
Monitoring-based Cx frequency of analysis and approach clarification
NC-v4 EAc1:Enhanced commissioningposted by Kevin Day on
LEED reference manual states "MBCx can be accomplished via systems submetering, operational points trending, and real-time analyses, such as fault detection and sequence verification."
Drawing Review
NC-v4 EAp1:Fundamental commissioning and verificationposted by Steve Connelly on
Is a drawing review of the building envelope required by EAp1 Fundamental Cx if Enhanced Option 2 is not being pursued?
Calculating landscaping
NC-v4 SSc2:Site development - protect or restore habitatposted by Tracy Jordre on
My question is related to both the Protect or Restore Habitat and Open Space credits. In the past I have included the total area of any landscaping bed, not just the area of each plant themse
E-waste
CI-v4 MRp1:Storage and collection of recyclablesposted by Agnieszka Rylska on
Is it enought that the tenant only will provide a safe storage for e-waste or is it required that the building also provides a central storage for all tenants?
Software for Energy Modelling
NC-v4 EAc2:Optimize energy performanceposted by Andrea Valentini on
Hello.
I'm working on a project in Italy and evaluating to buy a new BIM software.
Is there anyone who knows if it's possible to analyze our building with a proper BIM SW?
Shared walls with another structure in baseline and proposed
NC-v4 EAc2:Optimize energy performanceposted by Christine McKinley on
Hello,
In my baseline model, can I show shared walls as exposed to exterior and then in my proposed model treat that wall as a partition?
Major renovation to existing building - EQp1 requirements
NC-v4 EQp1:Minimum indoor air quality performanceposted by Navisa Jain on
We have a 6 storey addition to an existing 4-storeyed building. The mechanical systems for the addition are separate from the existing systems.
Metering make-up water for geothermal system
NC-v4 WEc4:Water meteringposted by Daniel Davis on
We are installing a meter onto the geothermal well water makeup water (due to evaporation/leakage) – will this count as the additional meter, under process water?