Forum quick links
Interior Reuse - shared walls with other businesses
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Lou Niles II on
Hello Can anyone give some advice on including Both sides or one side of interior walls for a Tenant Improvement where the other side of the wall is a space not in the scope.
Core and shell building’s energy
CS-v4 EAc5:Renewable energy productionposted by Devendra Chaughule on
Dear All,
We are doing a LEEDv4 CS project. For applying this credit, we need to engage 50%-100% (1-2 points) of total energy to be addressed by green power, REC and or offsets.
Size of shower and changing facilities
Data-Centers-NC-v4 LTc6:Bicycle facilitiesposted by Marion THIBAULT on
Hi,
Do we have minimum requirements for the size and configuration of changing facility shower ?
Thanks
Marion
Use of bidets
NC-v4 WEp2:Indoor water use reductionposted by Jorge Adalberto Bernal Segovia on
Hello,
Seven Point Scale for Occupant Comfort Survey
EBOM-v4 EQc10:Occupant comfort surveyposted by Alex Goulden on
Hello,
Is data-sharing letter needed from Owner?
CI-v4 EAc3:Advanced energy meteringposted by Renee Shirey on
In LEED NC-v4 - EAc Building-Level Energy Metering a letter is required from the Owner to state their commitment to share energy consumption data.
If treatment is used, cycles may exceed the number of cycles i the Table
NC-v4 WEc3:Cooling tower water useposted by Sue Bryant on
The FORM in LOL next to the Table: Potable water analysis, says that if treatment is used, cycles may exceed the number of cycles in the Table.
How does the USGBC evaluate EPD expiration dates for projects with long construction periods.
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by James Howarth on
Hello,
Various FCU's in Single Zone
NC-v4 EAp2:Minimum energy performanceposted by Greenlab on
Hello Everyone,