we c1

NC-v4 WEp1:Outdoor water use reduction
posted by  Maria Peralta  on 

Hello! 

I have an enquiry regarding this credit.

1
Mon Jul 29, 2019, 1:21 am

usgbc leed online site very slow and times out

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Christopher Cowie  on 

why is the usgbc leed online site so slow?  I can bearly work on line and the site keeps timing out.

2
Wed Jul 24, 2019, 2:04 pm

Option 3, Exterior wall repair and repointing

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Edgar Arevalo  on 

For this project, certain brick enclosure sections of exterior wall area are to undergo repair and repoint since they are damaged.  Since repair isn't necessarily considered replacement, which

0

Thermal storage and Optimize Energy Performance

NC-v4 EAc2:Optimize energy performance
posted by  Stephan Zweig  on 

Hell to all LEED users,

We are examininig to implement in out project a ice thermal storage systems.

The charges during the the night are better than during the day.

1
Tue Jul 23, 2019, 3:17 pm

Lighting group control for On/Off/Mid Lighting control requirement

NC-v4 EQc6:Interior lighting
posted by  Thomas Tan  on 

Dear LEEDusers,

We have a project with a manufacturing space to pursue the Interior lighting control credit. Dimmers for task lights is not acceptable as safety issue.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Tue Jul 23, 2019, 1:51 am

CI-v4 LTc3 - Access to quality transit - trip questions

CI-v4 LTc3:Access to quality transit
posted by  Don Blair  on 

Question 1: If a city bus that serves a bus stop within a 1/4 mile of our project has bus trips only on weekdays and not on the weekend, can I still count the&nbs

0

LEED v4-Credits MR-USGBC approved program

CI-v4 MRc3:Building product disclosure and optimization - environmental product declarations
posted by  Dipti Talwar  on 

Dear all, about MRc3 in LEED v4, could I have more information or links where can I find information especially about USGBC approved program? Thank you in advance!

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Mon Jul 22, 2019, 7:38 pm

CS EA credit Enhanced Cx - who can serve as CxA

CS-v4 EAc1:Enhanced commissioning
posted by  Deeta Bernstein  on 

Any precedent in pursuing the Enhanced Cx credits with a CxA who is also the design engineer for P/FP/FA, but is not providing M/E design?

1
Sun Aug 11, 2019, 9:30 pm

Any way to exclude non-electrical consumption

NC-v4 EAc7:Green power and carbon offsets
posted by  Edgar Arevalo  on 

The client wants us to pursue this credit with the hopes of achieving two points, for this project we are consuming both electricity and natural gas as per the energy model.  However, the clie

1
Mon Jul 22, 2019, 10:03 pm

Electrical Buses as an Innovation Credit

NC-v4 INc1:Innovation
posted by     on 

A Mass transit project will be using Electric buses to serve the routes. As for LTc8 Green Vehicles, the project already has preferred parking and EV charging stations covered.