Forum quick links
Natural Ventilation - Mixed-mode path
NC-v4 EQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
Dear All,
We're currently trying to certify an office building project with the following characteristics:
Lab Exhaust Fan Power - ASHRAE 2013
NC-v4 EAc2:Optimize energy performanceposted by Pooja Sannamani on
Hi,
Interior Paints and Coatings
NC-v4 EQc2:Low emitting materialsposted by Reinhard Oppl on
Who can help to clarify?
Design Compliance: Space activity level not addressed by ASHRAE 55-2010
NC-v4 EQc5:Thermal comfortposted by RDK E&S on
Hi all,
Signage of preferred parking
CS-v4 LTc8:Green vehiclesposted by Erkki Seinre on
A project has smaller parking on ground level in front of the building and larger parking underground.
Water Requirement of Landscape Plants
NC-v4 WEc1:Outdoor water use reductionposted by Rodolfo Loro, Jr. on
Hello. I have a project that has no landscape consultant, so the architects are asking for assistance in choosing plants that will help us meet the 30% to 50% outdoor water reduction.
Water Requirement of Landscape Plants
NC-v4 WEp1:Outdoor water use reductionposted by Rodolfo Loro, Jr. on
Hello. I have a project that has no landscape consultant, so the architects are asking for assistance in choosing plants that will help us meet the 30% to 50% outdoor water reduction.
PROJECTION FACTORS FOR VERTICAL FINS
CS-v4 EAp2:Minimum energy performanceposted by Fotis Kotsopoulos on
Dear all,
Is it possible to correlate vertical fins with projection factors shown in table 5.5.4.4.1 ASHRAE 90.1-2010?
FK
Entryway System in TSLA
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Brightworks Sustainability on
My CS v4 project wants to pursue Enhanced IAQ Strategies but we are not responsible for installing entryway systems or walk-off mats.