Forum quick links
Flush-out in phases
CI-v4 EQc4:Indoor air quality assessmentposted by Roshni Mathur on
We are working on a project wherein the interior fit-out work will be carried out in 2 phases. Consequtively the occupancy will be in 2 phases aswell.
Request for Clarification - Pre-Consumer Recycled Content, LEED v4.0/v4.1
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by HMTX Industries on
Greetings!
PV system energy going directly to the grid
NC-v4 EAc2:Optimize energy performanceposted by Camilo Velez on
Good afternoon everyone,
Definition of Informal Transit
NC-v4 LTc5:Access to quality transitposted by Michelle Rosenberger on
What is the definition of informal transit that is referenced in v4 Step 2 guidance?
Switching Options Post-Preliminary Design Review
NC-v4 LTc4:Surrounding density and diverse usesposted by Darrah Jakab on
We are pursuing Option 2 and received comments in the preliminary design review that makes this option not tenable, but we believe we can achieve Option 1.
Energy modeling of Seconday pump in equest:
NC-v4 EAp2:Minimum energy performanceposted by PURUSHOTHAMAN on
In my project, for the base case as per ASHRAE 90.1-2010 Sys-8, I need to model both the primary and secondary pumps in the chilled water loop.
Would a fieldhouse structure be included within the LEED Boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by on
Our project is a community centre that includes a field house structure on site. The fieldhouse is partially enclosed, with the other portion covered by a canopy.
Multiple Cx Agents for the Option Paths
NC-v4 EAc1:Enhanced commissioningposted by Saagar Patel on
I do commissioning and I work at a design firm. When a customer pursues both Fundamental and Enhanced cx- my group would not be able to do the Cx of the project. However, we believe the