Innovation : Clean construction pilot credit

NC-v4 INc1:Innovation
posted by  Loic Angot  on 

Location : Ontario, Canada

Hi, 

3
Default Avatar
LEED coordinator
Lemay CO
LEEDuser Basic Member
1 thumbs up
Wed Jun 30, 2021, 9:11 pm

Air Class 1 Recirculation

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  CT G  on 

We're working on a EBOM building, in which the main space is an indoor arena. There are also support spaces around the main arena, such as offices, gym, yoga rooms, etc.

1
Thu Jul 8, 2021, 6:25 am

MR credits- which divisions?

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  LUCY WILLIAMS  on 

The previous versions of LEED limited the MR credits to Divisions 2 through 10 and 12. It excluded MEP materials.

9
Wed Jun 30, 2021, 8:51 am
6
Wed Jun 30, 2021, 7:05 am

Excluding top floors and roof from LEED CS boundary

CS-v4 MPR2:Must use reasonable LEED boundaries
posted by  Varunya Jarunyaroj  on 

Our LEED-CS project is a commercial office tower locating on the retail podium.

2
Sustainable Consultant
INSPEC Sustainability Group LLC
LEEDuser Premium Member
43 thumbs up
Wed Jun 30, 2021, 4:48 am

Indoor water use reduction

CS-v4 WEp2:Indoor water use reduction
posted by  GABRIELE Medley  on 

For this credit to achieve 5 pts you must show 45% reduction. If you are at 44.95% would that be considered? 

1
Mon Jun 28, 2021, 9:38 pm

Baseline Energy Source for Electric only Building energypro

NC-v4 EAp2:Minimum energy performance
posted by  Mike Magee  on 

A bit of a newbie to LEED stuff, but does anyone know how to make the baseline energy source electric in stead of gas?

 

1
Fri Jul 9, 2021, 5:37 pm
2
Mon Jun 28, 2021, 9:43 am

Demolishing an existing school with asbestos

Schools-NC-v4 MRc5:Construction and demolition waste management
posted by  Priscillia Champagne  on 

We are currently working on a school project that will be completed in several phases. An existing school is located on the project site and will be occupied until the new building is constructed.

0