Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent
1
Mon Oct 30, 2023, 3:46 pm
2
Principal
ME Engineers
LEEDuser Premium Member
29 thumbs up
Thu Apr 14, 2022, 7:04 pm

Option 2 :Only CO2 sensors

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Dina El-Sady  on 

The project is totally mechanically ventilated .I am choosing adding CO2 sensors in dense areas for option 2 for additional points .What should be done in other small spaces ?Can we only add CO2 se

3
Wed Apr 13, 2022, 2:12 pm

Is janitor closet water use considered as Process Water and need to be measured apart of domestic fixtures piping?

NC-v4 WEp3:Building-level water metering
posted by  Mauricio Toro  on 

We have been receiving comments from the LEED reviewer team asking for information to confirm that the non-fixture usage (e.g.

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Sat Apr 9, 2022, 12:10 pm

Lighting control for hotel lobby, bar, restaurant

Hospitality-NC-v4 EQc6:Interior lighting
posted by  Giuseppina Amorusi  on 

Good morning

I have a question relating lighting control in a hotel building.

0
1
Tue Apr 12, 2022, 1:42 pm

Fire alarm cables (Public Address system) in the hospitals

Healthcare-v4 MRc6:PBT source reduction - lead, cadmium and copper
posted by  Najam Us Saqib  on 

Fire alarm cables are same like electrical cables, however, its function is different.

1
Tue Oct 22, 2024, 3:52 pm

Contractor is not able to comply with Cx Specifications

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Timothy Ian Middleton  on 

We have a project where the contractor is not able to comply with the Cx Specifications and Testing Procedures provided by the CxA.

3
Thu Apr 7, 2022, 9:51 am