Prescriptive Compliance - Core and Shell
CS-v4 EAp2:Minimum energy performanceposted by Shashank Singh on
Hi Folks,
LEED Campus Matrix
Mid-Rise-v4 MPR2:Must use reasonable LEED boundariesposted by sana salman on
Hi ,
Who can supply Potable water analysis results?
NC-v4 WEc3:Cooling tower water useposted by Alex Edwards on
Hello,
Off Site Renewable Energy Purchase
NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear Concern:-
Option 2 :Only CO2 sensors
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Dina El-Sady on
The project is totally mechanically ventilated .I am choosing adding CO2 sensors in dense areas for option 2 for additional points .What should be done in other small spaces ?Can we only add CO2 se
Is janitor closet water use considered as Process Water and need to be measured apart of domestic fixtures piping?
NC-v4 WEp3:Building-level water meteringposted by Mauricio Toro on
We have been receiving comments from the LEED reviewer team asking for information to confirm that the non-fixture usage (e.g.
Lighting control for hotel lobby, bar, restaurant
Hospitality-NC-v4 EQc6:Interior lightingposted by Giuseppina Amorusi on
Good morning
I have a question relating lighting control in a hotel building.
HVAC system within the scope of tenant
CS-v4 EAp2:Minimum energy performanceposted by Ashish Nautiyal on
Hello All,
Fire alarm cables (Public Address system) in the hospitals
Healthcare-v4 MRc6:PBT source reduction - lead, cadmium and copperposted by Najam Us Saqib on
Fire alarm cables are same like electrical cables, however, its function is different.
Contractor is not able to comply with Cx Specifications
NC-v4 EAp1:Fundamental commissioning and verificationposted by Timothy Ian Middleton on
We have a project where the contractor is not able to comply with the Cx Specifications and Testing Procedures provided by the CxA.