Warehouses-NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Helena Garcia on
The project is a warehouse divided in two parts: storage and offices.
Question about Option 4. Parking Under Cover
EBOM-v4 SSc3:Heat island reductionposted by J.W. Shin on
We are working on a LEED O+M: existing building project with a multilevel parking space (10th floor mechanical parking) attached to the main building.
DECLARE label as CSR
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Edgar Arevalo on
So the contractor is providing submittals for paint materials, they state in their copy of the BPDO calculator that the products comply with Option 1 since the products have Manufacturer Declared C
100% Renewables onsite
NC-v4 EAc7:Green power and carbon offsetsposted by Omar Elrawy on
Hi All,
I have project with a solar farm that covers 100% of our energy consumption.
WEp2 - ice-machine requirements - EnergyStar
NC-v4 WEp2:Indoor water use reductionposted by Jeff Wiedmeyer on
Does any one know definitively that all ice-machines installed on LEED v4 projects must be EnergyStar certified or of equivalent perfomance?
Stairwell Lighting zone
NC-v4 EAp2:Minimum energy performanceposted by Agnieszka Rylska on
According to ASHRAE 90.1, section 9.4.1.6 „g.