how to justify the conformity of our dishwashers with energy star while knowing that they do not hold the ENERGY STAR certific?
NC-v4 WEc2:Indoor water use reductionposted by Sara BENLOUBA on
Hello everyone,
EPD: products with same technical charachteristics but different thickness, are considered distincts products (BA13/BA15,
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Sara BENLOUBA on
Hello everybody,
Cafeteria with patio seating
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Margaret Montgomery on
In a cafeteria situation where indoor seating bleeds into patio seating with operable windows and person doors between, I assume we still need a walkoff system?
Area behind fiberglass enclosure IF WALLBOARD IS INSTALLED
Homes-v4 MRp2:Durability managementposted by Marijana Misic on
With fiberglass tub surrounds, the flanges are typically attached to the studs, and moisture-resistant wall finish is overlapped above and sealed.
Translucent fixture for strategy D
NC-v4 EQc6:Interior lightingposted by Omar Elrawy on
IF I have a lighting fixture with direct light, however, the fixture's glass is translucent / white glass. i.e.
Water sving are 101% according to calculator
NC-v4 WEp1:Outdoor water use reductionposted by Alexia Anastassiadis on
Hi, I am working on a project in Argentina.
No occupancy nor plumbing fixtures on a Warehouse
NC-v4 WEc2:Indoor water use reductionposted by Instra Ingenieros on
Hello everyone!
MRc3 Sourcing of Raw Materials - purchase of reclaimed brick
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by chuck merritt on
We are currently sourcing materials for the exterior space of our project and were trying to figure out if locally reclaimed belgian blocks would be applicable to the MRc3 Sourcing of Raw Mate
Envelope commissioning report
NC-v4 EAc1:Enhanced commissioningposted by Diana Giraldo on
We have aproject that had envelope comissioning inspecton done, are there any samples of a report or any guidance for the consultant that completed the inspection?