Forum quick links
LEED ND GIBp1 - WELL Building Certification
ND-v4 GIBp1:Certified green buildingposted by Jennifer Bryant on
Would certification of buildings within the masterplan under the IWBI's WELL Building Standard V2 be sufficient to fulfil the requirements of this credit?
Baseline SFP for tenant fan-coils
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear all,
Cx scope for ventilation, air conditioners of the base building
CI-v4 EAp1:Fundamental commissioning and verificationposted by Michael on
My store project is located inside a big department store in Japan. All HVAC system in my project is controlled by the landlord of the base building.
Is a combination possible?
NC-v4 EAc7:Green power and carbon offsetsposted by Garrett Ferguson on
We have a project that purchases electricity from their local utility provider, which provides just over 33% green-e certified green power to their customers.
Natural ventilation in polluted cities
CI-v4 EQp1:Minimum indoor air quality performanceposted by Antonio Tenorio on
I'm working on an ID+C project located in Mexico City.
The owner wants to implement natural ventilation to save energy.
On site or Off site seperation
CS-v4 MRc5:Construction and demolition waste managementposted by Andrea Tirao on
Our project has extensive generation of wastes into different activity zones.
Buildable Land
NC-v4 LTc4:Surrounding density and diverse usesposted by Deborah Stadler on
Does a Regional Detention Pond for a planned development count as 'buildable land' per LEED? We think since it has been set aside for water retention, is should not be included in the 'builda
LEED Modeling Requirements for a CI projects
CI-v4 EAp2:Minimum energy performanceposted by elvin ruya on
Hi,
We have a LEED CI project where our scope only includes 2nd floor and floors 10th to 16th of a 39 story building. My main question is;
Whole Building LCA
Schools-NC-v4 MRc1:Building life-cycle impact reductionposted by Nove Sol on
Hello all,
I have a question related to whole building LCA in LEED. For example when comparing wood building construction to Concrete Building construction.
Master Site: Substitution credit from LEED v4 to LEED v4.1
NC-v4 WEc3:Cooling tower water useposted by Mario Angelo Pinoli on
Hi everyone,
we registered a project as a Master Site in LEED v4 version and we would like to replace the WEc3 credit with the same credit of the LEED v4.1 version.