Forum quick links
upload daylight calculation of seperate building in a Group for a Master Site
Warehouses-NC-v4 EQc7:Daylightposted by N. Josef Nassif on
Dear Community
I hope you are doing fine.
Furniture reuse
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Marie Miller on
Hello - I'm working on a TI project and the client is reusing over half their furniture. I know I include this in the calculator, but do I use the value of the furniture when it was purchased?
Adjustable luminaries tilt - Option 1 (BUG) Vs Option 2 (Calculation)
NC-v4 SSc6:Light pollution reductionposted by Anna Korinkova on
Hi,
I would like to clarify how to characterize adjustable luminaires.
Pilot Credit: Procurement of Low Carbon Construction Materials (Cemco Sure-Board)
NC-v4 INc1:Innovationposted by Dejana Harris on
A project pursuing MRpc123 Procurement of Low Carbon Construction Materials is using Cemco Sure-Board, which is a prefabricated fiber cement panel and steel assembly.
Lights mounted under a photovoltaic canopy
CS-v4 SSc6:Light pollution reductionposted by Samuel Calhoun on
Hi. A project I am assessing has a photovoltaic canopy that covers roof parking. Do the lights under this canopy need to be included in the BUG assessment?
Advanced Metering for district cooling
NC-v4 EAc3:Advanced energy meteringposted by Camilo Velez on
Hi all,
We have encountered a peculiar situation in our project due to a couple of factors:
DOAS with 2 energy wheel
NC-v4 EAp2:Minimum energy performanceposted by Mohamed Shehata on
How to simulate DOAS with 2 energy wheels in the simulation software
How to include existing fixtures in the calculator
NC-v4 WEp2:Indoor water use reductionposted by Hashir Usman on
Dear all,
Exhaust fan in energy model
CS-v4 EAp2:Minimum energy performanceposted by Julio Fernandez Amodia on
Hi there,