NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear All:-
we have working LEED Group Project Building with 5 nos of Building
Managing rainwater in clay soil with low permeability
CS-v4 SSc4:Rainwater managementposted by Maria Glädt on
Hi, Our project site is a landfill area which was used as a parking during the construction of a tunnel located nearby. The site consists on very low permeable soil (mainly clay).
Rainwater management for large industrial site
NC-v4 SSc4:Rainwater managementposted by Erin Holdenried on
Hello - We have a large industrial site that is using a pond to manage about 25% of the rainwater and a vegetated channel to manage about 75% of the rainwater. I believe the vegetated channel
Above ground storage tanks
NC-v4 LTc3:High priority siteposted by Samuel Calhoun on
A project I am working on had (QTY: 27) above ground storage tanks removed from the site. This work was overseen by a 3rd party consultant, permitted by the local AHJ, and registered with the DEP.
Documentation for Inherently non-emitting materials
NC-v4 EQc2:Low-emitting materialsposted by Edgar Arevalo on
We have an insulation material that can comply either as inherently non-emitting or meets general emissions evaluation, and has been checked as inherently non-emitting by the contractor,
Review comment on PV-A report
NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
Dear all,
Kitchen faucet nominal flow rate vs maximum flow rate
CI-v4 WEp1:Indoor water use reductionposted by shashank gangil on
We are doing a CI project in Hong Kong and going to select a kitchen faucet for installation in the pantry.
Counting Dimmable Luminaires
CS-v4 SSc6:Light pollution reductionposted by Helen Biersack on
for a project in lighting zone 3 (U3 allowance or 500 UL and 500 HL for total of 1000), I am reviewing a submittal for a light with the following performance data:
50% of Receptable Controls to meet the Prerequisite
NC-v4 EAp2:Minimum energy performanceposted by Kritika Kharbanda on
We are working on a project where it was missed during equipment procurement that open office furniture is required to have 50% of the receptacles controlled to meet the prerequisite under 90.1-201
Comprehensive Composting
NC-v4 INc1:Innovationposted by Alma Evans on
Hi there, I registered the project I worked on in Austin, TX - Govalle Elementary School for the comprehensive composting pilot innovation point and I want to thank AISD for providing the requ