Shower & Changing room - does it require a sink and toilet?

NC-v4 LTc6:Bicycle facilities
posted by  Todd Bundren  on 

I am working on a student housing project on a university campus. The majority of the building are resident rooms with some amenity spaces.

1
Sustainability Consultant | Senior Project Manager
Re:Vision Architecture
LEEDuser Premium Member
10 thumbs up
Fri Jun 12, 2026, 5:32 pm

AEDG Calculator Needed When Base Building Systems Weren't Modified or Contributing to Savings?

CI-v4 EAc2:Optimize energy performance
posted by  Gera Feigon  on 

I have a small office fit-out project that is pursuing Option 2 (prescriptive) for Optimize Energy Performance.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Jun 11, 2026, 3:45 pm

Credit substitution with v4.1

NC-v4 LTc3:High priority site
posted by  Herman Calleja  on 

Could the 'High Priority Site' credit in LEED v4 be substituted with the LEED v4.1 credit 'High Priority Site and Equitable Development'?

Thank you 

1
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Fri Jun 5, 2026, 5:55 pm
1
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Jun 1, 2026, 6:26 pm

ISO 16000 testing for low emitting materials

NC-v4 EQc2:Low-emitting materials
posted by  Linh Dang  on 

Our project currently has several materials that have been tested in accordance with ISO 16000-9.

0

Entryway system

CI-v4 EQc1:Enhanced indoor air quality strategies
posted by  RAMON CHRISTOPHER MEDRANO  on 

I have a office space project, that will have an entryway system (walk off matt).

6
Thu May 28, 2026, 5:58 pm

Option 2. financial support

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Theresa Lehman  on 

Has anyone achieved this credit for a government entity such as a municipality, where the government entity has provided a financial budget to restore greenway space, waterways, etc.

0

Data sharing memo still required?

NC-v4 WEp3:Building-level water metering
posted by  Erica Downs  on 

Are Owners no longer required to submit the “Data Sharing Commitment letter”??  There is no longer anywhere to upload a memo, or a box to check. 

0

Emergency Showers and Bicycle Facilities

CI-v4 LTc4:Bicycle facilities
posted by  Crista Shopis  on 

Could emergency showers included in a Lab project meet the requirements for Bicycle Facilities credit?

1
Sustainability Consultant | Senior Project Manager
Re:Vision Architecture
LEEDuser Premium Member
10 thumbs up
Fri May 22, 2026, 7:41 pm
11
Thu May 21, 2026, 7:49 pm