Interior element reuse in different project

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Nadia Azzam  on 

Our project is demolishing a wall partition which is going to be reused on a different project (not the one applying for LEED).

0

Interior Reuse - is pipework and air duct Interior non structural elements?

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  shashank gangil  on 

We are doing a LEED CI V4 project. The client will use existing air duct, diffuser, grilles, provided by the landlord and AC chilled water pipe.

2
Thu Jul 6, 2023, 5:13 pm

Calculations for demountable partitions

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Marie Miller  on 

I'm working on a TI project and we're trying to get the Design for Flexibility point. When calculating for this credit, do we use linear feet or square feet of the product?

0

Design of flexibility - Can an open ceiling be counted as an accessible ceiling?

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Michael   on 
Hi LEED experts, my interior Office wants to have an open ceiling, where people can see and access the piping, ductwork system, and HVAC machines hanging below the ceiling structure.
1
Fri Apr 15, 2022, 4:18 pm
4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Dec 11, 2020, 1:13 pm

Required documentation - credit form versus reference guide

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Dee Spiro  on 

I'm posing this question under this particular credit, but it's actually applicable to a number of credits in a number of the rating systems.  For this credit, the credit form includes th

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Aug 6, 2020, 3:34 pm

If bare raised floor is covered with carpet - is it reused?

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Diana Nezamutinova  on 

1. In our fit-out project in London the base building provides raised access floor that cannot be used as is due to acoustic and aesthetic reasons.

3
Default Avatar
Senior Consultant
Arcadis
LEEDuser Basic Member
2 thumbs up
Mon Apr 27, 2020, 2:04 pm

Interior reuse calculation, What is counted?

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Mark Ragucci  on 

Our project is on the second floor of a 3 story building. To start the space has had finishes removed for hazardous abatement before construction demo.

0

Option 3 flexible lighting control system required documentation

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Alara Brinton  on 

I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.

3
Thu Sep 26, 2019, 9:21 am

Interior Reuse - shared walls with other businesses

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Lou Niles II  on 

Hello Can anyone give some advice on including Both sides or one side of interior walls for a Tenant Improvement where the other side of the wall is a space not in the scope.

0