Water source heat pump with cooling tower and boiler
CI-v4 EAc3:Advanced energy meteringposted by Gaston Michaud on
Hi all!
Cutsheet of Btu meter for chilled water metering
CI-v4 EAc3:Advanced energy meteringposted by Nagaraj Sankar on
Credit - Advanced Energy Metering
Total Annual Consumption
CI-v4 EAc3:Advanced energy meteringposted by Deborah Stadler on
Our CI project is not doing an energy model, but using the prescriptive method (AEDG). What is the acceptable way to determine the Total Annual Consumption to confirm uses above the 10% that
DOASs provide outdoor air to more than one tenant
CI-v4 EAc3:Advanced energy meteringposted by CT G on
We're working on a project where the tenant occupies 2 floors in a 4 story-building. This building has DOAS units that supply OA to all 4 floors.
Fan Powered Box Metering Category
CI-v4 EAc3:Advanced energy meteringposted by Daniel Thien on
We have a building that uses fan-powered boxes with integral electric heaters to serve each zone. The fan-powered boxes come from the manufacturer with one electrical connection point, and th
Tenant floor sub metering
CI-v4 EAc3:Advanced energy meteringposted by R Jones on
Hi - we have a multi level office building - the proposal is to have sub metering of energy uses to each floor ie- heating, chilled water for cooling but to sub meter lighting and recepta
Advanced energy metering - specific qualifications
CI-v4 EAc3:Advanced energy meteringposted by Chad Dunbar on
We have a 250k sf outpatient facility under construction on a hospital campus and we will be providing compliant electrical submeters on panels serving lighting and receptacle loads (the electrical
Advanced Energy Metering, Opt.2 - Data Must Be Remotely Accessible
CI-v4 EAc3:Advanced energy meteringposted by Graeme Smith on
We under that... "The data must be remotely accessible"... but how does USGBC define remote accessibility?
Meeting Option 2 Requirements
CI-v4 EAc3:Advanced energy meteringposted by Bonny Gray on
Below are the construction review comments from our reviewer:
Option 2: Advanced Metering
Partial renovation of owner-occupied building
CI-v4 EAc3:Advanced energy meteringposted by Dee Spiro on
Our ID+C project is in a higher-ed campus building that houses the facilities team, their back-of-house workshop spaces and office areas for the FM team and various other associated depar