Forum quick links
Baseline Economisers
CI-v4 EAc2:Optimize energy performanceposted by Ciaran McCabe on
Can ASHRAE 90.1 - 2010 Table 6.5.1B be applied to a LEED PRM models.
Pumps in LEED Energy Models
CI-v4 EAc2:Optimize energy performanceposted by Ciaran McCabe on
LEED v4 CI EAb Opt. Energy Perf. : Option 2 : AEDG Maximum Project Size requirements
CI-v4 EAc2:Optimize energy performanceposted by Kristen Callori on
Our project is an existing 300,000 sf Office building. Our client is both the new owner and will be the sole tenant.
Building Envelope: does this requirement apply only for new envelope, or for existing also?
CI-v4 EAc2:Optimize energy performanceposted by Micaela Smulevich on
We are working on a CI v4 project, that is three stories high. Client is looking into replacing some of the exterior windows. Not all windows would be in the scope of work.
Energy Modelling - Baseline water-cooled chiller's COP, adjusted to local outdoor conditions in lieu of AHRI conditions?
CI-v4 EAc2:Optimize energy performanceposted by Andrew Xiao Junzhao on
Dear LEED APs,
I have a LEED CI v4 project in Taipei, Taiwan, which require whole building energy modelling. Couple of questions I hope to seek clarity:
ENERGY STAR Equipment and Appliances Policy
CI-v4 EAc2:Optimize energy performanceposted by Saurabh Shrestha on
I am working on a project where the ownership has a policy that requires 100% of equipment and appliances to be ENERGY STAR-rated.
Modelling outdoor air flow rate in baseline energy model - ASHRAE 62.1 and Local Code
CI-v4 EAc2:Optimize energy performanceposted by Ciaran McCabe on
Hi all,
Energy Model Scope for CI Project with independent HVAC system
CI-v4 EAc2:Optimize energy performanceposted by Marie Garcia on
hi Marcus / hi everyone,
HVAC Equipment Efficiency
CI-v4 EAc2:Optimize energy performanceposted by Jonathan Koh on
Hi, my building has a single tenant and we are going for LEED ID+C. The building is served by a water-cooled chiller plant and chilled water fan coil units.