Forum quick links
IAQ test: laboratory accreditation
NC-v4 EQc4:Indoor air quality assessmentposted by Caroline MORA on
Dear all,
we are facing issues finding a laboratory with ISO/IEC 1702 accreditation to perform the indoor air quality tests.
Owner Supplied Furniture - non-residential
NC-v4 EQc4:Indoor air quality assessmentposted by Leanne Conrad on
We are approaching the start date of our IAQ assessment and I would like to be 100% sure that I need to include owner supplied furniture in the test.
0.5 PPB above threshold
NC-v4 EQc4:Indoor air quality assessmentposted by Omar Elrawy on
Dear all,
Our IAQ test results show compliance for all parameters except for Fromaldehyde, which is 27.50 PPB , meaning that it is only 0.50 PPB above the threshold.
Flushing Out a Hockey Rink
NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
My project is a new construction hockey arena pursuing Option 1, Path 1 for the flush out. The thing is, we have ice. Ambient temperatures will not be above 60 degrees.
Option 1, path 2 flushout hours
NC-v4 EQc4:Indoor air quality assessmentposted by Susan Di Giulio on
Hi all,
Air Testing - UVGI
NC-v4 EQc4:Indoor air quality assessmentposted by Francesco Passerini on
Can equipment UVGI (Ultraviolet germicidal irradiation) be used during the test?
Shall that be permantly installed?
Question about IAQ - Option 1 - Path 1
NC-v4 EQc4:Indoor air quality assessmentposted by Roshni Lad on
Hello,
I am working on one of the GBCI comments for NC v4 project - in which I am being asked to provide the following:
Air Testing - Direct Reading
NC-v4 EQc4:Indoor air quality assessmentposted by HONG MEE SONG on
Are direct reading method acceptable for the reading of parameters for Particulates, CO2, CO and Ozone? The reference method used are complied to the Leed however.
Option 1 Path 2 - What's Been Your Experience?
NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
Hi all,
Show of hands for those that have used Option 1, Path 2, post occupancy flush out:
Do you provide trending data for both phases, or just the preliminary phase?
IAQ Testing Post Constuction - Pre Occupancy
NC-v4 EQc4:Indoor air quality assessmentposted by Peter Del Sette, Jr on
I'm try to figure out how many tests I need to run for EQ3 V4.