Post a question or comment
Credit Filters
Low emitting materials
Filter by location
Forum
Topic
Replies
Recent

Spray foam fireproofing = "fire-proofing coatings" per SCAQMD Rule 1113?

NC-v4 EQc2:Low emitting materials
posted by  Renee Shirey  on 

Does anyone know for sure how spray foam fireproofing (for structural steel members) is categorized for VOC content?  My educated guess was fire-proofing coatings, but wasn't positive.&nb

3
Fri Apr 3, 2020, 9:20 pm
9
Mon Mar 30, 2020, 10:07 am

Outside US Project

NC-v4 EQc2:Low emitting materials
posted by  PAWAN DAHIWAL  on 

We are working on LEED v4 project  - New construction (Gulf). We have targeted this credit for atleast 2 points.

2
Wed Mar 25, 2020, 8:53 am

Chinese standard GB 18582-2008 'Indoor decorating and refurbishing materials...'

NC-v4 EQc2:Low emitting materials
posted by  Olga Yuil  on 

Does any know if the chinese standard GB 18582-2008 'Indoor decorating and refurbishing materials.

0

Clarification Re. General Emissions Requirement for Multi-part Acoustical Wall Treatment

NC-v4 EQc2:Low emitting materials
posted by  Vanessa Nelson  on 

We have a project with sound recording studios with drywall throughout and an acoustical wall treatment that will be assembled on site and attached to select portions of the drywall.

0
3
Thu Mar 5, 2020, 8:55 pm

Soldering Paste for Piping Applications

NC-v4 EQc2:Low emitting materials
posted by  Shannon Oletic  on 

Does soldering paste used by the plumbing sub trade need to comply with EQ Low Emitting Material requirements for adhesives and sealants?

Appreciate your insight!

0

Where to look for manufacturer documentation

NC-v4 EQc2:Low emitting materials
posted by  Lissa Spitz  on 

Is it just me?  I'm having a hard time finding manufacturer documentation that confirms compliance with CDPH, aqBB, etc.

9
Wed Mar 4, 2020, 4:29 pm

Does Hardware need to be included in the Walls category?

NC-v4 EQc2:Low emitting materials
posted by  Renee Shirey  on 

Since hardware (locksets, closers, kickplates) is installed on a door, and a door is part of the Walls category, is hardware required in the Walls category?  I am leaning towards 'Yes", b

3
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Fri Feb 14, 2020, 10:02 pm