Post a question or comment
Credit Filters
Enhanced indoor air quality strategies
Filter by location
Forum
Topic
Replies
Recent

Entryway System in TSLA

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Brightworks Sustainability  on 

My CS v4 project wants to pursue Enhanced IAQ Strategies but we are not responsible for installing entryway systems or walk-off mats.

4
Default Avatar
Sustainability Engineer
Ecosolutions
LEEDuser Basic Member
6 thumbs up
Thu Mar 26, 2020, 3:57 pm

CS requirements for office space

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Timothy Ian Middleton  on 

We have an office building project. Circulation, F&B and reception areas have high enough density that they will require CO2 sensors for this credit.

0

Option 2 A Exterrior contamination prevention - software

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Przemysław Rejczak  on 

Dear everyone,

Could you please inform which is the most reasonable software to prepare CFD analysis to show Exterrior Contamination Prevention compliance?

1
Sat Nov 23, 2019, 3:03 am

Entryways systems in Retails places out the LEED certification

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Mauricio Ramirez  on 

Hello Dear I´m writing you because i have a doubt about the entryways systems in my project C&S v4.

1
Wed Oct 6, 2021, 9:13 pm
1
Thu May 16, 2019, 2:30 pm

entrance to a roof terrace

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Agnieszka Rylska  on 

I would like to ask if an entrance to a roof terrace is considered a regularly used exterior entrance which needs a 3m long enetryway system?

3
Mon Nov 19, 2018, 10:25 pm

Specs for approved roll out mat that is less than 10'-0" in length

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Victor Caban-Diaz  on 

Does anybody have specs for an approved roll out mat that is less than 10'-0" in length that can be used for this credit?

0

entry way and air filtration

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  MARIA ESTHER LAMADRID  on 

Can entry way systems be located in the exterior but under canopy?

0

Inconsistency between BD+C and O+M

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Adam Stoker  on 

Despite efforts to better align the rating systems in LEED v4, there are some inconsistencies between the Enhanced Indoor Air Quality Strategies credits in BD+C and O+M.

0