Building product disclosure and optimization - sourcing of raw materials
Filter by location
Forum
Topic
Replies
Recent

Locally sourced rebar

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Michelle Rosenberger  on 

We are struggling to understand the new constraints on locally sourced products and how this new credit encourages any local sourcing at all.

6
Director of Global Market Sustainability
Interface
LEEDuser Premium Member
30 thumbs up
Fri Jan 26, 2018, 3:03 pm
2
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Sat Jan 6, 2018, 1:58 pm

Guide Language

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  PAWAN DAHIWAL  on 

Under several material credits its mentioned that "Procure 20 different permanently installed item from 5 different manufacturer"...for EPD/CSR My question is, 1) To meet the requirement under th

5
Sustainability Project Manager
Atkins
LEEDuser Basic Member
59 thumbs up
Fri Dec 29, 2017, 12:20 pm

Credit Documentation Requirements

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Jenelle Shapiro  on 

Is there a minimum requirement for supporting documentation for this credit in regards to uploading onto LEED Online?

1
Wed Nov 1, 2017, 2:32 pm

Extended Producer Responsibility - documentation

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Tristan Roberts  on 

Has anyone pursued this credit using Extended Producer Responsibility? Did you find that you had to meet any specific documentation requirements?

5
Thu Oct 19, 2017, 8:51 pm

BPDO Calculator Error

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Michael Wahjudi  on 

Hi all, anybody having issue with the BPDO calculator? Since we have used for our projects and the data are misplaced under different sheets.

1
Mon Dec 28, 2015, 2:36 pm

Is there a limit to how many products can use the same CSR?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Alexa Stone  on 

An industry-wide (generic) EPD can be used for up to 10 products listed within the industry-wide EPD, provided that each application has separately reported impacts within the EPD.

1
Fri Jun 9, 2017, 11:00 am

what all is included in material cost

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Brianna Brandsen  on 

Is labor to deliver (i.e. drive time, time to unload materials, and / or shipping costs from suppliers) and / or unload materials on a job site included in the material cost?

1
Mon Aug 15, 2016, 9:30 pm

FSC calculations - weight or volume?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Julie Hardy  on 

Good afternoon everyone, We are wondering if the FSC contribution should be calculated, as in LEED 2009, by volume or weight for products.

1
Mon Aug 28, 2017, 2:38 pm

Conveying systems now accepted for this credit

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Paula Melton  on 

A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who

0