Forum discussion

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials

Example of a populated BPDO calculator with all tabs

Project Location: United States Trying to determine for EPD tab within BPDO calculator, if the bottom-line of Weighted EPD value needs to be 20 or as long as 20 products from 5 manufacturer's are noted, compliance is met? Also how would a UL PCR for Insulated Metal panels be classified - my hunch is Industry-wide, but seeking advise from others, below is the PCR link http://industries.ul.com/wp-content/uploads/sites/2/2014/09/IMPandMetalC...

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.