Option 4 Building LCA Clarification

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Peko Xejis  on 

Hi, I'm confused about this option, according to the LEEDUSER's viewpoint page of this credit, if I don't have any existing building to use, I cannot pursue this option?

Thanks.

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Fri Oct 4, 2019, 6:03 am

Whole Building Life Cycle Assessment for MR Credit "Building Life-Cycle Impact Reduction", Option #4 - LCA tools recommended.

NC-v4 MRc1:Building life-cycle impact reduction
posted by  RICHARD ABRAHAMS  on 

I am pursuing Option #4 for the Whole Building Life Cycle Assessment for MR Credit "Building Life-Cycle Impact Reduction".

1
Tue Oct 1, 2019, 8:33 pm

Option 3, Exterior wall repair and repointing

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Edgar Arevalo  on 

For this project, certain brick enclosure sections of exterior wall area are to undergo repair and repoint since they are damaged.  Since repair isn't necessarily considered replacement, which

0

MRc1 Option 3

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Barbara Clarke  on 

We have the calculations sf for our existing exterior enclosure and areas to be reused (excluding windows). How do we calculate the Exterior structure? 

0

LCA Baseline

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Elizabeth Repin  on 

Hello:

Can we only change envelope assemblies for baseline; do all other items to be the same as the proposed building? 

Thank You! 

 

0

Addition to Historic Structure

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Peter Doo  on 

We are looking at a project in which we are constructing an addition to a registered historic structure. SF of old/new is about 50/50.

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Fri Apr 5, 2019, 2:46 pm

Materials inside the building

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Konstantina Kalliakoudi  on 

Hello,

In my understanding the credits:

Building Life Cycle Impact Reduction

Building Product Disclosure and Optimization - EPD

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Jan 24, 2019, 10:56 am

Existing Building as LCA Baseline

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Kristen DiStefano  on 

One of the four options for creating LCA baselines according to this LEED Interpretation - https://www.usgbc.org/content/100002019 - is to use an existing building, and make modifications necessary

4
Default Avatar
President
Athena Sustainable Materials Institute
LEEDuser Basic Member
6 thumbs up
Fri Jan 11, 2019, 10:14 pm

Changes in the LEED v4.1 BD+C draft to the Option 4 WBLCA - positive, overall

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Panu Pasanen  on 

As most will have noted, the language for the v4.1 BD+C draft came out just before holidays.

0

Historic District vs Historic Building

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Cynthia Kaplan  on 

Has anyone had success obtaining this credit with a building within an historic district?

2
Sustainability Program Manager
Primus Design Services, LLC
LEEDuser Premium Member
40 thumbs up
Wed Jan 2, 2019, 3:26 pm