Hello,
In my understanding the credits:
Building Life Cycle Impact Reduction
Building Product Disclosure and Optimization - EPD
Building Product Disclosure and Optimization - Sourcing of Row materials
Building Product Disclosure and Optimization - Material Ingredients
concern the materials inside the building and not outside.
Is this right?
Thank you
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11478 thumbs up
January 23, 2019 - 8:42 am
No, that is not the case. They generally cover all permanently installed building products.
Konstantina Kalliakoudi
Mechanical Engineer13 thumbs up
January 24, 2019 - 5:56 am
Tristan thank you for your answer.
Let me write all of my consideration.
I meant:
For the credit:
- Building Life Cycle Impact Reduction - if you choose Option 4 -Whole Life cycle Assessment, you need to input data only for the building and not for the outside surrounding area, isn't it?
- Building Product Disclosure and Optimization - EPD - Option 1: You can choose 20 different permanently installed materials that are inside the building, isn't?
This consideration came from because I was thinking how a larger Leed Boundary would affect these credits.
I think that with the assumptions I mentioned above, a larger Leed Boundary wouldn't affect these credits at all.
What do you think?