BOD review from the BECx consultant
NC-v4 EAc1:Enhanced commissioningposted by Julie Trottier on
Good Morning,
Monitoring-based Cx frequency of analysis and approach clarification
NC-v4 EAc1:Enhanced commissioningposted by Kevin Day on
LEED reference manual states "MBCx can be accomplished via systems submetering, operational points trending, and real-time analyses, such as fault detection and sequence verification."
Monitoring Based Cx in Specification
NC-v4 EAc1:Enhanced commissioningposted by Rachel Manoguerra on
Our Cx firm has recently been asked to include Monitoring Based Cx language in our standard Cx Spec.
Envelope CxA within the engineering company part of design team?
NC-v4 EAc1:Enhanced commissioningposted by Erika Roy on
Hello,
Eligibility of EMS for MBCx
NC-v4 EAc1:Enhanced commissioningposted by Gustavo De las Heras Izquierdo on
Hallo,
Envelope Cx - whole-building air leakage testing
NC-v4 EAc1:Enhanced commissioningposted by Julien Richard on
Is it acceptable if the air leakage testing is done by a subcontractor of the general contractor when all the other aspect of the envelope commissioning are done by an independant CxA ?
Enhanced Cx Option 2 Envelope Commissioning Requirements
NC-v4 EAc1:Enhanced commissioningposted by Krystina Kattermann on
Hi folks,
Building Envelope CxA
NC-v4 EAc1:Enhanced commissioningposted by Harry Flamm on
This is a question with a slightly different twist from some other recent posts:
Sam Cx agent for Enhanced & Envelope commissioning
NC-v4 EAc1:Enhanced commissioningposted by Cora Kenrick on
Can the same Cx complete both option 1 and option 2 for the Enhanced Commissioning?
Enchanced Cx - District/Campus System Guidance - Floor Area trigger
NC-v4 EAc1:Enhanced commissioningposted by on
One of the triggers of the upstream equipment Cx requirements for EAc1 is that the "project building's gross floor area is greater than 50,000 square feet." Does this 50,000 GSF trigger refer to th