Post a question or comment
Credit Filters
Enhanced commissioning
Filter by location
Forum
Topic
Replies
Recent
1
Sun Aug 11, 2019, 10:01 pm

Monitoring-based Cx frequency of analysis and approach clarification

NC-v4 EAc1:Enhanced commissioning
posted by  Kevin Day  on 

LEED reference manual states "MBCx can be accomplished via systems submetering, operational points trending, and real-time analyses, such as fault detection and sequence verification." 

4
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Sat May 25, 2019, 4:21 am

Monitoring Based Cx in Specification

NC-v4 EAc1:Enhanced commissioning
posted by  Rachel Manoguerra  on 

Our Cx firm has recently been asked to include Monitoring Based Cx language in our standard Cx Spec.

1
Fri May 3, 2019, 12:08 pm

Envelope Cx - whole-building air leakage testing

NC-v4 EAc1:Enhanced commissioning
posted by  Julien Richard  on 

Is it acceptable if the air leakage testing is done by a subcontractor of the general contractor when all the other aspect of the envelope commissioning are done by an independant CxA ?

7
Sustainability Manager
Structure Tone
LEEDuser Basic Member
0 thumbs up
Mon Jan 28, 2019, 3:11 pm

Building Envelope CxA

NC-v4 EAc1:Enhanced commissioning
posted by  Harry Flamm  on 

This is a question with a slightly different twist from some other recent posts:

1
Wed Oct 10, 2018, 8:50 pm

Sam Cx agent for Enhanced & Envelope commissioning

NC-v4 EAc1:Enhanced commissioning
posted by  Cora Kenrick  on 

Can the same Cx complete both option 1 and option 2 for the Enhanced Commissioning?

2
Regional Director
Horizon Engineering Associates
LEEDuser Premium Member
40 thumbs up
Fri Oct 5, 2018, 5:55 pm

Enchanced Cx - District/Campus System Guidance - Floor Area trigger

NC-v4 EAc1:Enhanced commissioning
posted by     on 

One of the triggers of the upstream equipment Cx requirements for EAc1 is that the "project building's gross floor area is greater than 50,000 square feet." Does this 50,000 GSF trigger refer to th

0