Forum quick links
Baseline: existing heat pumps, new FCs
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
I'm modeling a commercial building that has 7 conditioned floors and is heated and cooled by 3 electric heat pumps. According to TABLE G3.1.1A the baseline model should be a System 8.
Outdoor air
NC-v4 EAp2:Minimum energy performanceposted by Emmanuel Pauwels on
In exception C in section G3.1.2.6 Ventilation, it states that 'If the minimum outdoor air intake flow in the proposed design is provided in excess of the amount required by the rating authority or
ASHRAE 2010 - Addendum ah - G3.1.3.18 Dehumidification
NC-v4 EAp2:Minimum energy performanceposted by Victoria Watson on
Hi, I am trying to work out how to apply Addendum ah for ASHRAE 2010 for system 5-8
Purchased CHW Baseline System Cooling Source
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
My project is an addition to an existing facility, so the CHW and HHW comes from a district plant. I am modeling the plant as cost neutral, purchased CHW and HHW in baseline and proposed
High-powered experimental equipment
NC-v4 EAp2:Minimum energy performanceposted by DAVE LI on
We have a laboratory with high-powered experimental equipment. High-power experimental equipment consumes a very high percentage of electricity.
Hotel mix use
NC-v4 EAp2:Minimum energy performanceposted by jefferson thomas on
We have a hotel with 4,000 SF of retail at the lower level of a new construction hotel project? How do we sepperate the two projects if they have a central energy plan for chilled water?
waste rooms
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
The project is located in Europe and standard EN 15251 is considered for the achievement of this prerequisite.
MEPC's New Construction U-value cannot be changed?
NC-v4 EAp2:Minimum energy performanceposted by JAMES CHEN on
Recently, we will build a two-floors building made of metal material, but ROOF and WALL of MEPC's New Construction Nonresidential will automatically run U-0.273 and U-0.479, respectively.
Removed windows
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In a building that is being refurbished some windows are removed and are replaced with opaque panels. How shall they be considered in the baseline model?