For proposed case with spot cooling only, how to model baseline and satisfy unmet for both propsoed and baseline
NC-v4 EAp2:Minimum energy performanceposted by Akhil Sumer on
Hi,
A proposed case with spot cooling in kitchen/food prep area is mechanically ventilated aswell. The spot cooling is served by PAHU units connected to ODU.
Baseline pressure drop adjustments
NC-v4 EAp2:Minimum energy performanceposted by Boris Jonjic on
Hi all,
I've got a question about calculating the pressure drop adjustments for a baseline building. I'm using LEED v4, ASHRAE 90.1 2010.
v4 DES option 1 path 2 full performance accounting
NC-v4 EAp2:Minimum energy performanceposted by ami patel on
I have a Zone 2A 6 story new construction residential dorm building uses ERU DOAS(gas fired(steam not generated on site but campus loop +DES chilled water) that provide outside air to fan coil unit
Issues Minimum Energy Performance Calculator
NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear All:-
we have working LEED Group Project Building with 5 nos of Building
Review comment on PV-A report
NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
Dear all,
50% of Receptable Controls to meet the Prerequisite
NC-v4 EAp2:Minimum energy performanceposted by Kritika Kharbanda on
We are working on a project where it was missed during equipment procurement that open office furniture is required to have 50% of the receptacles controlled to meet the prerequisite under 90.1-201
Baseline Required Outdoor Airflow for Toilets
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi Forum Users!
Exceptional Calculation for Process Loads Without Recent Conventional Practice
NC-v4 EAp2:Minimum energy performanceposted by Philip Harsh on
Hi all,
Baseline heating source where no fossil fuel is provided to building
NC-v4 EAp2:Minimum energy performanceposted by Kevin Gilleran on
Hi,
G3.1.1 exception d exhaust hood airflow baseline
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi All,