ND-v2009 NPDp1:Walkable streetsposted by Susann Geithner on
We have a parking garage attached to an office building. The office building is on a public street, so is the garage. So the building is between two streets.
Sidewalk definition
ND-v2009 NPDp1:Walkable streetsposted by Tyler Baker on
Hello, I have a question about how sidewalk is defined. We have a sidewalk along the street edge of a park, and the park has a playground in it.
Front lawn sidewalk width
ND-v2009 NPDp1:Walkable streetsposted by Colin Day on
Hi Eliot, Our project has entry walks leading from public sidewalks to front doors that are slated to be 3 feet wide.
Breezeway Principal Functional Entry?
ND-v2009 NPDp1:Walkable streetsposted by Tommy Linstroth on
Just hoping for a clarification/second opinion. Our project features 2-3 story walkup apartments that are access by central breezeways.
Building height to street width ratio calculation
ND-v2009 NPDp1:Walkable streetsposted by Tyler Baker on
Hi, Our project is LEED pre-certified plan, with some single detached houses.
Ratio 1:3
ND-v2009 NPDp1:Walkable streetsposted by Diana Nezamutinova on
Greetings, Eliot! Would you please be so kind to help with 4 questions below?
Walkable Streets: Sidewalk Width
ND-v2009 NPDp1:Walkable streetsposted by Aaron Ryan on
Our project has a block in which each block face is lined with townhouses or multi-family buildings. On one corner is a mixed-use building.
Continuous sidewalks for industrial use street
ND-v2009 NPDp1:Walkable streetsposted by Noriko Nagazumi on
Hi there! The reference guide says: "Continuous sidewalks or equivalent all-weather provisions for walking are provided along both sides of 90% of streets or frontage within the project, includin
Sidewalk with landscaped area
ND-v2009 NPDp1:Walkable streetsposted by Noriko Nagazumi on
Hi, In our project, continuous sidewalks of 2.5m width are provided for all street within the project boundary, but a portion of one of the sidewalks is filled with shrabs and trees and people can
Functional Entries
ND-v2009 NPDp1:Walkable streetsposted by Omer Moltay on
Hi, The credit language is confusing for us. Some on the project team think that the credit is asking for at least one functional entry on every facade that faces a public space.