net area vs gross area (simulation) in IEQc8.1
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Panagiota Dadinou on
Hello, a question concerning IEQc8.1 & IEQc8.2 . Can we use the net floor area instead of gross floor area for the simulation in Matrix_Table IEQ-1 Daylight and views? I would like to use t
To what extent we provide Tenant fitout
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Indochine Engineering VN on
Hi, my project has 19 office floors, and one floor is already fitted out by tenant. So the rest 18 floors are empty - open office.
Zone Floor Area Calculation
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Maggie Hogan Skaug on
For the prescriptive method, how is Zone Floor Area calculated for a multi-floor office building with no tenant build-outs? Is the ZFA = 2 times the window head height? Thanks
Glare control
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Belén Valladares López on
Hi, We're working in a project trying to achieve this credit by option 3 (measurement). Our façade is an existing curtain wall. There are two different skins.
Daylight for CS v2.0
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Citlali Mora Bello on
Hello, we are working on a project that will be submitted under the C&S v2.0 Do you know if we must still meet the 25 fc criteria, before the 2012 addenda? And we also have reception areas wh
the area meet the requrement must the same area?
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Shenhao Li on
Hi guys Please help me solve below three question 1.LEED Guidance required 75% of all regularly occupied spaces meet the daylight requirements at both 9 a.m.
Daylight simulation high rise office building - CS 2.0
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Olivier Brouard on
Dear forum, I hope the following help request is falling under the right LEED version, since the calculations I am running are following the guidelines of CS2.0 as the design studies of the buildi
Need For Automated Shades
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Brandon Scales on
I am currently working on a school project using option 2 on the IEQ 8.1 form. Many of the rooms have a VLTxWFR ratio that exceeds 1.8.
Daylight calculations for office spaces with tenants
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Mathilda Jonsson on
Hi all! I'm working with at office building seeking LEED for CS certification. I have these big floor plans of 6383 divided by 3-4 tenants.
CS project: How do I know the regularly occupied spaces?
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Susan M. Kaplan on
Do I need to work with the tenants and base our calculations on their interior fit-out design to evaluate whether we're meeting 75% of all regularly occupied spaces?