Forum quick links
partial renovation / partial expansion EAc1 points
CS-2009 EAc1:Optimize Energy Performanceposted by Katherine Ann Resurreccion on
We've learned that for projects with partial renovation and partial expansion a new points thresholds should be calculated for EAc1.
Simulation software and Ashrae 90.1 version
CS-2009 EAc1:Optimize Energy Performanceposted by Antonio Márquez on
Hi, we are certifying a new C&S building, in v2009. The version of Ashrae 90.1 to follow is 2007?
Annual Equivalent Full Load Hours of DHW Operation
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Hi, In relation to Table 1.4 where can one get "Annual Equivalent Full Load Hours of DHW Operation". Is this something I need to calculate or is it a standard value ?
Alternative Compliance Path
CS-2009 EAc1:Optimize Energy Performanceposted by Gabriela Mena on
Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if the
LEED Core and Shell: Energy Performance Improvement
CS-2009 EAc1:Optimize Energy Performanceposted by Jeann Vieira on
When modeling a building under the Core and Shell system, do I have to compare the energy performance only between systems under the project scope, i.e. Core and Shell?
modelling of tenant areas in a core and shell LEED project
CS-2009 EAc1:Optimize Energy Performanceposted by Puteri Shireen Jahnkassim on
Dear All, My question refers to the LEED Core and Shell modelling guidelines in Appendix 2 of the LEED BD&C guide. Under the subheading 'tenant spaces' it states that ...'...
Tenant Area HVAC System
CS-2009 EAc1:Optimize Energy Performanceposted by Nidhi Khanna on
Hi, I am working on a mixed use project with retail on 1st floor and office on 2nd and 3rd floor with a total project area of 115,000 sf.
Common Area Spaces/Tenant Fit Out
CS-2009 EAc1:Optimize Energy Performanceposted by Heather South on
I am working on a Core & Shell LEED 2009 project and am wondering if for the energy simulation model on the proposed building versus the baseline, should we only include the shared common space
Min Chiller Efficiency
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
I am trying to establish the minimum chillier efficiency we are permitted to use in our PRM model. We have spec'd an air cooled chiller.