v2009 Min. Performance Calculator - Service Hot Water Inputs
CS-2009 EAc1:Optimize energy performanceposted by Ciaran McCabe on
With reference to Service Hot Water should the following baseline inputs match the proposed; If not where can I find good guidnace on how these baseline inputs can be obtained.
Core & Shell Lab building
CS-2009 EAc1:Optimize energy performanceposted by Suraj Shah on
We are applying for a CS project which primarily will house research labs.
airflow limitation of lab spaces during unoccupied periods
CS-2009 EAc1:Optimize energy performanceposted by heinrich post on
According to Ashrae 90.1-2007 G3.1.1.d there should be a fan flow limitation for lab spaces in the baseline model during unoccupied hours. "For Lab spaces with a minimum of 5000 cfm of exhaust, use
HVAC System Type for heating only warehouse
CS-2009 EAc1:Optimize energy performanceposted by Matt Short on
After reading through the forum I have not found a response that specifically addresses a CS building who's future tenant finishout of office and warehouse space is yet to be designed but has the f
Site Obstructions & Shading
CS-2009 EAc1:Optimize energy performanceposted by Ciaran McCabe on
Is it recommended to include adjacent buildings to represent the shading effects in the proposed model. If so do I assume that I also include it in the baseline model also.
WBS: Exhaust Air Energy Recovery in Baseline HVAC
CS-2009 EAc1:Optimize energy performanceposted by Marco Abdallah on
Hi! I have got a question regarding ASHRAE G3.1.2.10 "Exhaust Air Energy Recovery" which has to be applied to the baseline model. It says that at a minimum outdoor air supply of 70 % or greater of
suspiciously high savings in auxillary power
CS-2009 EAc1:Optimize energy performanceposted by shashank jain on
high savings in auxillary power Hi we are modelling a 18 storey office block in Sap Paulo and getting some results we wanted to cross check, as we doing the energy model for the first time... Desc
EA Credit 1 ACP (Alternative Compliance Path)
CS-2009 EAc1:Optimize energy performanceposted by Harry Flamm on
Can someone direct me to any supporting information that explains the use of the Alternative Compliance Path for EA Credit 1 ACP?
Energy Model For A Campus
CS-2009 EAc1:Optimize energy performanceposted by Ciaran McCabe on
Hi, I am working on a Leed campus project where there is 3 separate buildings which each consist of retail units on the ground floor and office units above.