tenant work: fan coils
CS-2009 EAc1:Optimize Energy Performanceposted by Johannes Gellrich on
Hello all, I'm working on a C&S project.
Update of the energy modelling for the construction review
CS-2009 EAc1:Optimize Energy Performanceposted by Juliette Barach on
Hi, I'm currently working on a LEED CS office building, and can't find a clear answer to my question in the LEED referential, user's guidance or standard: Do I need to update the energy modellin
Appendix G Oversizing
CS-2009 EAc1:Optimize Energy Performanceposted by Jorge Torres-Coto on
I have a reviewer requesting that we oversize the PROPOSED case for a "possibly conditioned in the future" warehouse. We have usually modeled the BASELINE case and PROPOSED case identical, then ove
Ooptimize Energy Performance
CS-2009 EAc1:Optimize Energy Performanceposted by Paula Hernandez on
I am not sure how to estimate a Core & Shell lighting Schedule for an office building, would somebody help me, Thans
Conditioned Floor Area
CS-2009 EAc1:Optimize Energy Performanceposted by Sunil Kumar Anantharaman on
G 3.1.1 of Appendix G performance rating method mentions that Base Line building design shall be based on "usage, no.
I wonder how I should model a Ventilation system
CS-2009 EAc1:Optimize Energy Performanceposted by Ron Dean on
I wonder how I should model a Ventilation system to comply with Apendix G ASHRAE, it said that my proposed desing shall be consistent with design documens.. This is the description of my system: &g
Boiler Thermal Efficiency (%)
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Is there a formula for calculating the Boiler Thermal Efficiency using HHV. Should the modeled boiler efficiency be seasonal taking into account part load conditions.
Energy simulation
CS-2009 EAc1:Optimize Energy Performanceposted by Redy Truccolo on
Hi, I'm running an energy simulation on a three floors office building. This building have also an entrance hall. The HVAC system for the office part is a VRV Fan Coil System with external air con
LEED Pressure Adjustment for Lab HVAC-Systems
CS-2009 EAc1:Optimize Energy Performanceposted by heinrich post on
Seems that some of my questions are not easy to answer. Here is another question for the same lab project. Fan system Power limitations are calculated according to Table 6.5.3.1.1A of ASHRAE 90.1-