Forum quick links
Existing Insulated Glass Units
CS-2009 EAp2:Minimum Energy Performanceposted by Donald Green on
We have an existing building whereby some of the existing glass will remain however we cannot determine what the thermal properties of the glass is because there is no documentation and the manufac
Building Area Method - highlighting merchandise
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
For a building I have to use the Building Area Method (ASHRAE 90.1-2007, 9.5.1) because some calculations were already developed through that method and now changing the method would be complicated
System type and OA input
CS-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
Hi Everyone! The project that we're working on will be in a country where the local code requires more outdoor air than 62.1 at most of the zone types.
Pressure Drop Adjustment
CS-2009 EAp2:Minimum Energy Performanceposted by Jan Hesse on
We are working on a Project with a central 100%OA AHU. We calculated the pressure drop adjustment for the baseline Systems 7 following ASHRAE 90.1-2007 table G3.1.2.9.
Core and Shell - Retail
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
We are working on a retail mall where each tenant retail space is provided with a chilled water tap off.
Mandatory provisions.
CS-2009 EAp2:Minimum Energy Performanceposted by Ron Dean on
Good day, I need to understand some thigs about 5.4, 8.4 and 10.4 of standar ashrae 90.1-2007.(My project is in Perú) 5.4- 5.4.1-'' Where insulation is required in 5.5 or 5.6, it shall comply with
EAp2 form issue on table 2-6
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
Our project is a CS mixed use: hopefully this is not too general a question. We cannot get the table EAp2-6 to pull down results from the previous tables.
No cooling in Proposed Building
CS-2009 EAp2:Minimum Energy Performanceposted by Johannes Hopf on
Our proposed building has no cooling system installed; it is ventilated naturally. Now Appendix G says to model the proposed building like the baseline bldg system. That means with a VAV.
Tenant lighting exceeds ASHRAE, how to model?
CS-2009 EAp2:Minimum Energy Performanceposted by Aaron Yorke on
Hello all, In LEED - CS office projects, since the tenant fitout is unknown, LPD is modeled 12 W/m2 according ASHRAE. However, in the country we are working, national standart for LPD is 20 W/m2.
Thin Client
CS-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, The owners of the building we are certifying want to evaluate the effects of the thin client (form 150 W/computer to 50W/computer) on EAp2/EAc1.