Pressure Drop Adjustment

CS-2009 EAp2:Minimum energy performance
posted by  Jan Hesse  on 

We are working on a Project with a central 100%OA AHU. We calculated the pressure drop adjustment for the baseline Systems 7 following ASHRAE 90.1-2007 table G3.1.2.9.

1
Fri Dec 6, 2013, 5:04 pm

Core and Shell - Retail

CS-2009 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

We are working on a retail mall where each tenant retail space is provided with a chilled water tap off.

1
Thu Feb 2, 2017, 3:32 pm

Mandatory provisions.

CS-2009 EAp2:Minimum energy performance
posted by  Ron Dean  on 

Good day, I need to understand some thigs about 5.4, 8.4 and 10.4 of standar ashrae 90.1-2007.(My project is in Perú) 5.4- 5.4.1-'' Where insulation is required in 5.5 or 5.6, it shall comply with

1
Thu Jun 14, 2012, 10:07 pm

EAp2 form issue on table 2-6

CS-2009 EAp2:Minimum energy performance
posted by  charles bell  on 

Our project is a CS mixed use: hopefully this is not too general a question. We cannot get the table EAp2-6 to pull down results from the previous tables.

1
Mon Feb 17, 2014, 4:38 pm

Glazing specifications for existing building

CS-2009 EAp2:Minimum energy performance
posted by  João Costa  on 

Hi, I am developing a simulation (EAP2/LEED CS) for an existing building located in Rio de Janeiro.

1
Sat Oct 4, 2014, 9:13 pm

LED podium box for advertisement

CS-2009 EAp2:Minimum energy performance
posted by  Katrina Chong  on 

Does anyone know whether LED monitors for advertisement are considered as exterior lighting? Does it need to comply with the 2.2W/m2 Exterior LPD requirement as stipulated in ASHRAE 90.1?

1
Tue Jan 27, 2015, 5:45 pm

typical floor v/s whole building simulation

CS-2009 EAp2:Minimum energy performance
posted by  shashank jain  on 

Hi we are doing the eap2 modelling for a 18 floor office building. the floors are all the same. we need to submit the modelling results for precertification.

1
Tue Apr 2, 2013, 1:12 pm

Baseline for Data Center

posted by  Billy Ng  on 
1
Thu Jan 13, 2011, 2:07 pm

LEED CS - EAp2 Existing equipment to remain

CS-2009 EAp2:Minimum energy performance
posted by  BAOQUY VU  on 

I have an existing 90,000 SF, 3-story office building in Massachusetts consisting of VAV boxes with electric reheat and rooftop units that also have electric heat.

1
Wed Sep 28, 2011, 1:58 am

Baseline System Fan Power...

CS-2009 EAp2:Minimum energy performance
posted by  Therese Malm  on 

...is calculated automatically by the energy simulation tool we use according to appendix G13.1.2.9.

1
Fri Aug 23, 2013, 1:29 pm