Construction IAQ management plan - before occupancy
Filter by location
Forum
Topic
Replies
Recent

Temperature and Humidity Monitoring During Flush

CI-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Nancy Henderson  on 

Is it part of the requirement of this credit to monitor temperature and humidity in the space during the flush out - or is it sufficient to provide the temperature set points and calculate the resu

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Mar 13, 2018, 3:01 pm

Question on Selecting IAQ Test Locations

CI-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Melissa Wrolstad  on 

I am working on a small ~6,500 sq. ft. LEED-CI office space.

1
Mon Nov 4, 2013, 4:26 am
1
Thu Jan 21, 2010, 1:02 am

IEQc3.2 VOC Testing

CI-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  mark morehouse  on 

I have a 191,000 sf nc school that will require 11 sample points.

1
Mon Aug 13, 2012, 3:59 pm

Option 1: Full Flush-out Before Occupancy - Is there a Min. CF?

CI-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Michelle Bracewell-Musson  on 

With Option 1, Path 1, we are expected to flush-out 14,000 cf/sf of outdoor air at 60 degrees temp. and 60% humidity min. Is there a minimum ventilation rate as with Path 2 which is 0.30 cf/min.?

1
Thu Sep 22, 2011, 3:37 pm

Is flush out possible in countries with high humidity?

CI-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Katherine Ann Resurreccion  on 

Hi, we would like to know if flush out is practicable in areas where high humidity is experienced whole year, say 70-85%. Should we cancel out option 1 already and go for option 2 (IAQ testing)?

1
Tue Sep 3, 2013, 9:46 pm

IAQ Testing AFTER Occupancy?

CI-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  buddy pribish  on 

I am aware of the verbiage in the LEED reference guide for IAQ testing to be completed PRIOR to occupancy, but considering that the flushout method can be completed DURING occupancy, I was wonderin

1
Fri Sep 14, 2012, 11:16 pm

IAQ testing in a continuously occupied office

CI-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Maggie Edelstein  on 

Our project is a government office that will be continuously occupied throughout the duration of construction.

1
Tue Sep 3, 2013, 9:47 pm

Option 1 - Path 2

CI-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Nancy Henderson  on 

I just had a mechanical engineer point out that the partial flush-out option does not include the requirement to maintain 60 degree temperature and 60% humidity.

1
Sat Jul 28, 2012, 1:07 am

outdoor delivery rates in a naturally ventilated space

CI-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Vera Voropaeva  on 

After receiving the project's review we are asked to provide outdoor delivery rates.

1
Thu Mar 21, 2013, 7:39 pm