ASHRAE 90.1-2016 Appendix G Baseline Heatsource
CI-v4 EAp2:Minimum energy performanceposted by Eric Dyer on
Hello,
We are working on a LEED v4.1 BD+C project where the proposed design uses both District Hot Water (Purchased Heat) and District Chilled Water (Purchased Cooling).
Pursuit of Procurement of Low Carbon Construction materials
Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materialsposted by Patty Marr on
Our project in Kirkland, WA has pursued this credit.
Lighting Control for Resting Room
NC-v4.1 EQc6:Interior Lightingposted by Muhammad Adtar on
We are currently reviewing compliance with LEED v4.1 EQ Interior Lighting credit for a data center project.
Design submittal or construction submittal
Pilot-Credits IPpc93:Prevention through Designposted by Dionisio Franca on
Is there any guidance on whether this credit can be submitted during the design submittal?
ASHRAE 90.1.2010 - Baseline System using Exception of G3.1.1
CI-v4 EAp2:Minimum energy performanceposted by SSN Energy Model on
Hi,
Greetings!
LEED v5:NC Clarification on suitability of minimum energy performance data center calculator to claim savings and confirming climate zone
NC-v5 EAp2:Minimum Energy Efficiencyposted by Sanket Sabale on
Hello team,
Good afternoon. While working on LEED v5 BD+C data center project in Frankfurt, Germany we are seeking for clarification on following queries
Biomass Process Steam
NC-v4 EAc5:Renewable energy productionposted by Keerthi Ratnayake on
Can steam produced from an on-site biomass boiler and used exclusively for manufacturing process loads be counted toward EA Credit: Renewable Energy Production in LEED v4 BD+C?
Option 3: Design for Flexibility, Plug-and-play lighting controls
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Crista Shopis on
I'm exploring this as a 3rd option for the Interiors Life-cycles credit but I have not found a example in these forums of this option being included in a successful submission.
Option 3 flexible lighting control system required documentation
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Alara Brinton on
I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.
Prevention through Design
NC-v4 INc1:Innovationposted by FUTING LI on
For projects located in China, can local national safety standards be used as an equivalent alternative to OSHA standards for this credit?