Topic | Recent |
---|---|
SkylightNC-v4 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Aug 3, 2021, 10:21 am
Greetings, We have to model a retailbuilding in Climate zone 5. The major retail zones of the project have wetical fenestration of about 1%. At the same time they are provided with... Last reply: Marcus Sheffer, Aug 4, 2021, 9:28 am |
|
LEED ZeroNC-v4 EAc5: Renewable energy productionposted by Vassil Vassilev on Nov 28, 2020, 2:59 amMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up December 4, 2020- 3:23 pm It appears that you have asked this question before relative to LEED 2009 projects. https://leeduser.buildinggreen.com/forum/wood-pellets-renewable-energy-s... Have you checked the LEED interpretations metnioned in that thread to see if they still apply to v4 projects? Log in or register to post comments Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up December 4, 2020- 3:29 pm I think pellets only made from mill residue/waste or agricultural waste would qualify. Such pellets would be considered off-site unless... Last reply: Marcus Sheffer, Dec 4, 2020, 3:29 pm |
|
Energy model as per ASHRAE 90.1-2013Retail-NC-v4 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Dec 2, 2019, 5:06 am
Greetings, We art to prepare an energy model for a project, which should be in accordance with ASHRAE 90.1-2013. The energy source of the project is electricity. The climate zone is... Last reply: Marcus Sheffer, Dec 2, 2019, 1:10 pm |
|
G3.1.1 | Exception b (40 equivalent full-load hours per week)CS-2009 EAp2: Minimum Energy Performanceposted by Danilo Ilic on Apr 1, 2019, 5:03 am
From what I could see in related posts, "40 equivalent full-load hours per week" are plainly interpreted as 40 working hours and without any connection to thermal load and I am... Last reply: Danilo Ilic, Apr 1, 2019, 9:39 am |
|
Construction Work Area DepressurizationNC-v4 EQc3: Construction indoor air quality management planposted by Danilo Ilic on Dec 12, 2018, 3:37 am
Does anyone have an example of how construction work area depressurization (in order to create a pressure difference between construction and clean areas) was... Last reply: Danilo Ilic, Dec 19, 2018, 4:25 am |
|
Prerequisite Required DocumentationNC-v4 EAp3: Building-level energy meteringposted by Danilo Ilic on Nov 26, 2018, 9:16 am
What constitutes "Confirmation of permanently instaled meters" in the required documentation part? Does it has to be a Riser Diagram or MEP Drawing showing the installed meters, or it can be... Last reply: Danilo Ilic, Nov 26, 2018, 10:57 am |
|
BUG method based on angle of mountingNC-v4 SSc6: Light Pollution Reductionposted by sladjana pandurovic on Jun 1, 2018, 7:00 am
Does the angle of installation of the... Last reply: Bill Swanson, Jun 1, 2018, 10:22 am |
|
Occupancy hours vs. Building Operating PlanEBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Anna Korinkova on Apr 16, 2015, 3:33 am
My question is regarding to operating hours of the building and the... Last reply: Dave Hubka, Apr 16, 2015, 8:45 am |