Topic | Recent |
---|---|
Is Athena Impact Estimator databses is recommende for South AsiaPilot-Credits MRpc63: Whole building life cycle assessmentposted by Malan Jayawickrama on Mar 8, 2017, 1:55 amBosco Fan LEEDuser Basic Member June 19, 2018- 3:22 am i have the same question. We are making an LCA for a project in Southeast Asia and hardly find any software supports with local database. Log in or register to post comments Paula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 183 thumbs up June 19, 2018- 10:27 am Malan and Bosco, sorry your questions got lost in the shuffle. Please re-post in the proper credit forum to increase the chance of getting an answer! Log in or register to post comments ... Last reply: Paula Melton, Jun 19, 2018, 10:27 am |
|
Providing shuttle service for the nearest bus stationNC-v4 LTc5: Access to quality transitposted by Magda Aghababyan on Oct 19, 2017, 12:01 am
Hi all, We have a new LEED NC project which is located in a developing industrial area. This area is still developing access to public buses and other services mentioned in LEED V4... Last reply: Susann Geithner, Feb 22, 2018, 3:57 pm |
|
Vertical GardensNC-v4 SSc2: Site development - protect or restore habitatposted by Magda Aghababyan on Oct 19, 2017, 2:24 am
Hi all, We have a project which is going to have vertical gardens with native and adapted plants on the building walls. Can we count these areas for the credit compliance? Thank you... Last reply: Calie Gihl, Nov 26, 2017, 1:27 pm |
|
30% fresh air allowance over minimum requirements of ASHRAE Standard 62.1NC-2009 EAp2: Minimum Energy Performanceposted by Kristof Skawinski on Nov 7, 2017, 11:03 pm
I strongly question this application of minimum 30% more fresh above ASHRAE Standard 62.1 for buildings in hot and humid climates like Colombo in Sri Lanka where designers on specific project... Last reply: Marcus Sheffer, Nov 8, 2017, 10:38 am |
|
Target FinderNC-2009 EAp2: Minimum Energy Performanceposted by Keerthi Ratnayake on Sep 28, 2017, 11:06 pm
Hi, We are working on a project located in Sri Lanka and the primary building type is industrial manufacturing. The building is unable to get a Target Finder score because the tool does... Last reply: Marcus Sheffer, Sep 29, 2017, 9:41 am |
|
Pharmaceutical Manufacturing factory projectHealthcare-v4 MPR1: Must be in a permanent location on existing landposted by Magda Aghababyan on Jun 6, 2017, 6:21 am
Hi, We are going to start a new LEED project for a pharmaceutical manufacturing facility building which will be started in a few months. Last reply: Tristan Roberts, Aug 26, 2017, 11:26 am |
|
Exterior lighting designCI-2009 EAc1.3: Optimize energy performance - HVACposted by Sivarajah Ragulakeethan on Jul 31, 2017, 1:18 am
Hi, Last reply: Marcus Sheffer, Aug 1, 2017, 11:00 am |
|
Nee of a fire suppression systemNC-2009 EAc4: Enhanced Refrigerant Managementposted by Magda Aghababyan on Jun 2, 2017, 5:54 am
Hi all, Last reply: Anna Bak, Jun 6, 2017, 9:46 am |
|
Aerators use in water flow fittingsNC-2009 WEp1: Water Use Reductionposted by Magda Aghababyan on Apr 3, 2017, 12:33 am
Hi, Last reply: Magda Aghababyan, Apr 5, 2017, 5:01 am |
|
Water use in a campus projectNC-2009 WEp1: Water Use Reductionposted by Magda Aghababyan on Mar 29, 2017, 1:30 am
We are working on a LEED campus project which is going to be certified with one new construction building (will be certified LEED NC 2009) and some other buildings which are not going to be... Last reply: Magda Aghababyan, Apr 5, 2017, 4:58 am |