Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Option 2 ASHRAE 50% AEDG - Equipment type not listed

NC-v4 EAp2:Minimum energy performance
posted by  Megan Gilman  on 

I have a project in Climate Zone 6, which is trying to use Option 2 under the prescriptive path, using the 50% AEDG for Small to Medium Office Buildings.  They'd like to avoid the ASHRAE 90.1

3
Tue Mar 13, 2018, 4:36 pm

Can the APPA Audit be modified for hotel spaces?

EBOM-v4 EQc6:Green cleaning - custodial effectiveness assessment
posted by  Ana Hagerup  on 

The percentage of APPA Space Categories (i.e. break room, conference room, copy/mail room, etc.) are specific to office buildings.

1
Tue Mar 20, 2018, 5:43 pm

Temperature and Humidity Monitoring During Flush

CI-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Nancy Henderson  on 

Is it part of the requirement of this credit to monitor temperature and humidity in the space during the flush out - or is it sufficient to provide the temperature set points and calculate the resu

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Mar 13, 2018, 3:01 pm

Reclaimed water use

NC-v4 WEc1:Outdoor water use reduction
posted by  Ann Runley Carroll  on 

If I am using all reclaimed/recycled water, do I still need to use the calculator. Where do I download the calculator? By using reclaimed/recycled water, do I get 2 points?

4
Mr
Green Building Council Georgia
LEEDuser Basic Member
3 thumbs up
Tue Mar 13, 2018, 11:41 am

Previously Developed Site vs. Prime Farmland

NC-2009 SSc1:Site selection
posted by  Jennifer Carlson  on 

I have a site that is currently on previously developed site. Utilities, sidewalks, etc are already in place. However the Soil Survey says the land the is prime farmland if drained.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Mon Mar 12, 2018, 8:41 pm
3
Director / Owner
JW+A | Green Building Experts
LEEDuser Basic Member
0 thumbs up
Mon Mar 12, 2018, 7:06 pm

FXCollaborative hiring a Sustainable Design Specialist

Green Commons
posted by  Ilana Judah  on 

We are hiring! Please share with any potential talented and passionate candidates.

0

Brick and rubble in soil

NC-v4 MRc5:Construction and demolition waste management
posted by  Marilyn Specht  on 

We are working on a LEED v4 project in an urban core. We are targeting 2 points for MRc5 and have an aggressive Construction & Demolition Waste Management Plan underway.

 

3
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Mon Mar 12, 2018, 5:59 pm

Brick and rubble in soil

CS-v4 MRc5:Construction and demolition waste management
posted by  Marilyn Specht  on 

We are working on a LEED v4 Core & Shell project in an urban core. We are targeting 2 points for MRc5 and have an aggressive Construction & Demolition Waste Management Plan underway.

2
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Mon Mar 12, 2018, 5:59 pm

Lighting Requirements for Hotel in Core and Shell

CS-2009 EAp2:Minimum energy performance
posted by  Jorge Lopez de Obeso  on 

Hi everyone,

We are currently working with a mixed-use building which has offices, commerce and a hotel.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Mon Mar 12, 2018, 2:57 pm