Smoking Rules within construction project boundariesNC-v4 EQc3: Construction indoor air quality management planposted by Marine Petrosyan on Mar 28, 2024, 2:39 am
Hi, All! We are currently facing two major questions during the work with the construction project team. 1. How does LEED treat electronic cigarettes? Is it prohibited the same way... |
|
NO MARKED BICYCLE LANESCS-v4 LTc6: Bicycle facilitiesposted by Marine Petrosyan on Aug 22, 2023, 5:01 am
Hi, All! Our project works to fully comply with the Bicycle Facilities credit. But the whole problem is, that due to the historical infrastructure development specifications, we do not... Last reply: Marine Petrosyan, Aug 24, 2023, 2:31 am |
|
Interior Project Water PerformanceEBOM-v4.1 WEc1: Water Performanceposted by yingling guan on Aug 29, 2022, 5:56 am
For interior project, if there is only one pantry faucet within the project scope. And occupants of this project will use other indoor water fixtures or fittings installed out of the this... Last reply: Summer Minchew, Apr 5, 2023, 9:59 am |
|
Quality Views from SkylightPilot-Credits EQpc117: Quality views in nonregularly occupied spacesposted by Yifeng Xu on Jul 28, 2020, 12:25 am
Hi All, We have one project with skylight on the roof and thinking if it is eligible as the quality view. Considering: - For view type 2: the only view outside glazing will be the... |
|
Water bottle drinking fountain- water usageNC-v4 WEc2: Indoor water use reductionposted by Erin Rowe on Feb 14, 2019, 1:55 am
I see that water-bottle fill stations / drinking fountains are not on the list of fixtures in the calculator. Do we just leave those out of the water savings calculations? Or should they be... Last reply: emily reese moody, Apr 25, 2019, 12:16 pm |
|
Fenestration assembly U valueNC-2009 EAp2: Minimum Energy Performanceposted by Sivarajah Ragulakeethan on Apr 3, 2018, 12:12 am
Dear All, I am working on a core and shell project, while I have been modeling the fenestration... Last reply: Marcus Sheffer, Apr 6, 2018, 1:30 pm |
|
Reverberation Time and BIG Open AreaNC-v4 EQc9: Acoustic performanceposted by Avtua Kraveishvili on Jul 14, 2017, 2:36 am
If open plan office is linked with entrance, guest circulation areas and corridors from another zone (which totally takes about 2'000 m2), how we can calculate and predict... |
|
Reverberation Time and VolumeNC-v4 EQc9: Acoustic performanceposted by Avtua Kraveishvili on Jul 14, 2017, 2:19 am
Hi, I have project where is several open plan offices with different volumes. LEED Acoustic Performance requires T60 below 0.8 sec. But it's impossible to get this result for 3'000 square cube... |
|
Waste to energy in LEED v3NC-2009 MRp1: Storage and Collection of Recyclablesposted by Darya Lukicheva on Oct 19, 2016, 5:42 am
Hello. I'm now working on a large project (180 000 m2) certification under LEED 2009 NC. I have 2 questions. First question is: Last reply: James Wilson, Jan 8, 2017, 4:40 pm |
|
Limiting site disturbanceNC-2009 SSc5.1: Site development - protect or restore habitatposted by Michael Smithing on Dec 15, 2015, 2:04 am
We have a site which meets the definition of... |