Log in
Forum » Asia – Central
Topic

Smoking Rules within construction project boundaries

NC-v4 EQc3: Construction indoor air quality management plan
posted by Marine Petrosyan on Mar 28, 2024, 2:39 am

Hi, All!

We are currently facing two major questions during the work with the construction project team. 

1. How does LEED treat electronic cigarettes? Is it prohibited the same way...

NO MARKED BICYCLE LANES

CS-v4 LTc6: Bicycle facilities
posted by Marine Petrosyan on Aug 22, 2023, 5:01 am

Hi, All!

Our project works to fully comply with the Bicycle Facilities credit. But the whole problem is, that due to the historical infrastructure development specifications, we do not...

Last reply: Marine Petrosyan, Aug 24, 2023, 2:31 am

Interior Project Water Performance

EBOM-v4.1 WEc1: Water Performance
posted by yingling guan on Aug 29, 2022, 5:56 am

For interior project, if there is only one pantry faucet within the project scope.  And occupants of this project will use other indoor water fixtures or fittings installed out of the this...

Last reply: Summer Minchew, Apr 5, 2023, 9:59 am

Quality Views from Skylight

Pilot-Credits EQpc117: Quality views in nonregularly occupied spaces
posted by Yifeng Xu on Jul 28, 2020, 12:25 am

Hi All,

We have one project with skylight on the roof and thinking if it is eligible as the quality view. Considering:

- For view type 2: the only view outside glazing will be the...

Water bottle drinking fountain- water usage

NC-v4 WEc2: Indoor water use reduction
posted by Erin Rowe on Feb 14, 2019, 1:55 am

I see that water-bottle fill stations / drinking fountains are not on the list of fixtures in the calculator. Do we just leave those out of the water savings calculations? Or should they be...

Last reply: emily reese moody, Apr 25, 2019, 12:16 pm

Fenestration assembly U value

NC-2009 EAp2: Minimum Energy Performance
posted by Sivarajah Ragulakeethan on Apr 3, 2018, 12:12 am

Dear All,

I am working on a core and shell project, while I have been modeling the fenestration...

Last reply: Marcus Sheffer, Apr 6, 2018, 1:30 pm

Reverberation Time and BIG Open Area

NC-v4 EQc9: Acoustic performance
posted by Avtua Kraveishvili on Jul 14, 2017, 2:36 am

If open plan office is linked with entrance, guest circulation areas and corridors from another zone (which totally takes about 2'000 m2), how we can calculate and predict...

Reverberation Time and Volume

NC-v4 EQc9: Acoustic performance
posted by Avtua Kraveishvili on Jul 14, 2017, 2:19 am

Hi, I have project where is several open plan offices with different volumes. LEED Acoustic Performance requires T60 below 0.8 sec. But it's impossible to get this result for 3'000 square cube...

Waste to energy in LEED v3

NC-2009 MRp1: Storage and Collection of Recyclables
posted by Darya Lukicheva on Oct 19, 2016, 5:42 am

Hello.

I'm now working on a large project (180 000 m2) certification under LEED 2009 NC. I have 2 questions.

First question is:
As far as I understand there are 5 LEED...

Last reply: James Wilson, Jan 8, 2017, 4:40 pm

Limiting site disturbance

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Michael Smithing on Dec 15, 2015, 2:04 am

We have a site which meets the definition of...